Laserfiche WebLink
Hours <br />minutes <br />410.18 LCY/Hour <br />204.28 LCY/Hour <br />2 Truck(s) <br />LCY/Hour <br />LCY/Hour <br />LCY/Hour <br />Total Truck Cycle Time: 2.781 <br />Loading Tool unit <br />Production 494.19 <br />LCY/Hour Adjusted for job efficiency: <br />Truck Unit Production <br />246.12 <br />LCY/Hour Adjusted for job efficiency: <br />Optimal No. of Trucks: 2 <br />Truck(s) Selected Number of Trucks: <br />Adjusted hourly truck team production: 408.55 <br />Adjusted single truck/loader team production: 408.55 <br />Adjusted multiple truck/loader team production: 408.55 <br />JOB TIME AND COST <br />Fleet size: 1 <br />Team(s) Total job time: 4.51 <br />Unit cost: $0.606 <br />/LCY Total job cost: $1,116.52 <br />Hours <br />minutes <br />410.18 LCY/Hour <br />204.28 LCY/Hour <br />2 Truck(s) <br />LCY/Hour <br />LCY/Hour <br />LCY/Hour <br />