Laserfiche WebLink
CIRCES Cost Estimating Software <br />EQUIPMENT MOBILIZATION / DEMOBILIZATION <br />PROJECT IDENTIFICATION <br />Agency or organization name: Division Of Reclamation, Mining And Safety <br />Task #: 051 State : Colorado Permit/job #: C -81 -035 <br />Date: 0112612010 County :La Plata Abbreviation :none <br />User: TAK Site :Kinq li Mine Filename :C035 -051 <br />sheet 1 of 2 <br />Permit or other job action :Midterm Review 6 <br />Task description :Mobilize equipment for King H Mine rill and gully maintenance <br />EQUIPMENT TRANSPORT RIG COST Shift basis: 1 per day <br />Cost data source : CRG Data <br />Truck tractor description : Generic on- highway truck tractor, 6x4, diesel powered, 400 HP (2nd half, 2006) <br />Truck trailer description : Generic folding gooseneck, drop deck equipment trailer (25T, 50T, and 100T) <br />Cost Breakdown <br />NON -ROADABLE EQUIPMENT <br />Available rig capacities : <br />0 -25 Tons <br />26 -50 Tons <br />51+ Tons <br />Ownership cost/hour: <br />$16.63 <br />$18.37 <br />$22.33 <br />Operating cost/hour: <br />$44.38 <br />$46.13 <br />$50.07 <br />Operator cost/hour : <br />$27.66 <br />$27.66 <br />$27.66 <br />Helper cost/hour : <br />$0.00 <br />$25.39 <br />$25.39 <br />Total Unit Cost/hour:1 Cost/hour: <br />$88.67 <br />$117.55 <br />$125.45 <br />Machine <br />Description <br />Weight/unit <br />(Tons) <br />Ownership <br />Cost/hr /unit <br />Haul Rig <br />Cost/hr /unit <br />Fleet Size <br />(No. units) <br />Haul Trip <br />Cost/hr /fleet <br />Return Trip <br />Cost/hr /fleet <br />DOT permit <br />Cost/fleet <br />-Cat D3G XL - 3P <br />-CAT 12H <br />9.81 <br />$11.26 <br />$88.67 <br />1 <br />$99.92 <br />$88.67 <br />$0.00 <br />$0.00 <br />14.41 <br />$22.18 <br />$88.67 <br />1 <br />$110.85 <br />$88.67 <br />Subtotals : <br />$210.78 <br />$177.34 <br />1 $0.00 <br />