Laserfiche WebLink
ROADABLE EQUIPMENT <br />Machine <br />Description <br />Total <br />Cost/hour /unit <br />Fleet Size <br />(No. units) <br />Haul Trip <br />Cost/hr /fleet <br />Return Trip <br />Cost/hr /fleet <br />- Generic 10 -12 cy, 6x4 <br />-Wafer Tanker, 2,500 Gal. <br />- Generic 12 -18 cy, 6x4 <br />$74.51 <br />2 <br />$149.02 <br />$149.02 <br />$60.90 <br />1 <br />$60.90 <br />$60.90 <br />$79.79 <br />4 <br />$319.16 <br />$319.16 <br />Haul time (hours) = <br />0.50 <br />0.50 <br />Total non - roadable mob /demob cost <br />$6,055.20 <br />Return time (hours) = <br />0.50 <br />0.50 <br />' two round trips with haul rig <br />Loading time (hours) = <br />1.00 <br />NA <br />Total roadable mob /demob cost ** : <br />$529.08 <br />Unloading time (hours) = <br />1.00 <br />NA <br />•• one round trip, no haul rig <br />Subtotals = <br />3.00 <br />1.00 <br />JOB TIME AND COST <br />Total job time : <br />6.00 <br />Total job cost : <br />$6,584 <br />Subtotals : <br />$529.08 <br />$529.08 <br />EQUIPMENT HAUL DISTANCE and TIME <br />sheet 2 of 2 <br />miles <br />mph <br />hours <br />Nearest major city or town within project area region : <br />Durango <br />Transportation Cycle Time : <br />Non- <br />Total one -way travel distance : <br />20.0 <br />Roadable <br />Roadable <br />Average travel speed : <br />40.0 <br />Equipment <br />Equipment <br />Haul time (hours) = <br />0.50 <br />0.50 <br />Total non - roadable mob /demob cost <br />$6,055.20 <br />Return time (hours) = <br />0.50 <br />0.50 <br />' two round trips with haul rig <br />Loading time (hours) = <br />1.00 <br />NA <br />Total roadable mob /demob cost ** : <br />$529.08 <br />Unloading time (hours) = <br />1.00 <br />NA <br />•• one round trip, no haul rig <br />Subtotals = <br />3.00 <br />1.00 <br />JOB TIME AND COST <br />Total job time : <br />6.00 <br />Total job cost : <br />$6,584 <br />sheet 2 of 2 <br />miles <br />mph <br />hours <br />