Laserfiche WebLink
sheet 1 of 2 <br />CIRCES Cost Estimating Software <br />TRUCK/LOADER TEAM WORK <br />PROJECT IDENTIFICATION <br />Agency or organization name: DRMS <br />Task #: 303 State : Colorado Permit/job # : C -81 -035 <br />Date : 0112112010 County: La Plata Abbreviation :none <br />User: TAK Site: King li Mine Filename : C035 -303 <br />Permit or other lob action :Midterm Permit Review 2010 <br />Task description: Haul fill f /west office drainage to portal cuts /acc. rd/wtr tank pad <br />HOURLY EQUIPMENT COST Shift basis : 1 per day <br />Eouipment Description <br />Truck/loader team -Truck : <br />-Loader: <br />Generic 12 -18 cy, 6x4 <br />CAT 938G (2003) <br />Support equipment -Load area : <br />-Dump area: <br />NA <br />CAT 938G (2003) <br />Road maintenance -Motor grader: <br />-Water truck: <br />NA <br />NA <br />Cost Breakdown : <br />Truck/Loader <br />Truck <br />Work Team <br />Loading Tool <br />Support Equipment <br />Load Area Dump Area <br />Road Maintenance Equipment <br />Motor Grader Water Truck <br />Import data filename: <br />truck2 <br />loader <br />NA <br />loader <br />NA <br />NA <br />% Utilization-machine: <br />82 <br />100 <br />NA <br />100 <br />NA <br />NA <br />- Ripper attachment : <br />NA <br />NA <br />NA <br />NA <br />NA <br />NA <br />Ownership cost/hour: <br />$16.03 <br />$2239 <br />NA <br />$22.39 <br />NA <br />NA <br />Operating cost/hour : <br />$33.82 <br />$2449 <br />NA <br />$24.49 <br />NA <br />NA <br />Ripper op. cost/hour : <br />NA <br />NA <br />NA <br />NA <br />NA <br />NA <br />Operator cost/hour : <br />$2229 <br />$38.54 <br />NA <br />$38.54 <br />NA <br />NA <br />Unit subtotals : <br />Number of units : <br />$72.13 <br />$85.41 <br />NA <br />$85.41 <br />NA <br />NA <br />0 <br />2 <br />1 <br />0 <br />1 <br />0 <br />Group subtotals : <br />Work: $229.67 <br />Support : $85.41 <br />Maintenance : $0.00 <br />Total work team cost/hour: $315.09 <br />MATERIAL QUANTITIES <br />Initial Swell Loose <br />volume : 18,217 CCY factor : 1.165 volume: 21,223 LCY <br />Source of quantity take -off :Map King 11- 007C:main portal 18148 cyds, fan porf/wtr tank4673 cyds <br />Source of estimated swell factor: DRMS estimate <br />Material purchase cost : $0.00 /LCY Total cost : $0 <br />HOURLY PRODUCTION <br />Truck Capacity: <br />Truck Payload (weight) Basis: Truck Bed (volume) Basis <br />Material weight : <br />2,700 pounds /LCY <br />Struck volume : <br />12.00 <br />LCY <br />Descr.:Earth - Wet excavated <br />Heaped volume: <br />18.00 <br />LCY <br />Rated payload : <br />50,300 pounds <br />Average volume: <br />15.00 <br />LCY <br />Payload capacity : <br />18.63 LCY <br />Adjusted volume': <br />18.00 <br />LCY <br />Final truck volume based on number of loader passes : <br />15.84 <br />LCY <br />'truck volume adjusted to not exceed rated payload or heaped volume <br />Loading Tool Capacity: <br />Job Condition Corrections : <br />Site altitude (ft.) : <br />7,500 <br />Rated capacity (nom. heaped) : <br />3.250 LCY <br />Truck <br />Loader <br />Source <br />Descr.: Loose material - mixed moist aggregates (95 -100 <br />Altitude adj.: <br />1.000 <br />1.000 <br />(Cat HB) <br />Bucket fill factor : <br />0.975 <br />Job efficiency : <br />0.830 <br />0.830 <br />(1 shift /day) <br />Adjusted bucket capacity : <br />3.169 LCY <br />Net correction : <br />0.830 <br />0.830 <br />