Laserfiche WebLink
sheet 1 of 2 <br />CIRCES Cost Estimating Software <br />TRUCK/LOADER TEAM WORK <br />PROJECT IDENTIFICATION <br />Agency or organization name: DRMS <br />Task # : 300 State : Colorado Permit/job # : C -81 -035 <br />Date : 0112112010 County : La Plata Abbreviation :none <br />User: TAK Site: King li Mine Filename : C035 -300 <br />Permit or other job action :Midterm Permit Review 2010 <br />Task description: Haul coal waste rock to King 1 waste pile <br />HOURLY EQUIPMENT COST Shift basis : 1 per day <br />(Equipment Description <br />Truck/loader team -Truck : <br />-Loader: <br />Generic 12 -18 cy, 6x4 <br />CAT 938G (2003) <br />Support equipment -Load area : <br />-Dump area: <br />NA <br />CAT 938G (2003) <br />Road maintenance -Motor grader: <br />-Water truck : <br />NA <br />NA <br />Cost Breakdown : <br />Truck/Loader Work Team <br />Truck Loading Tool <br />Support Equipment <br />Load Area I Dump Area <br />Road Maintenance Equipment <br />Motor Grader Water Truck <br />Import data filename : <br />truck2 <br />loader <br />NA <br />loader <br />NA <br />NA <br />% Utilization-machine: <br />100 <br />10 <br />NA <br />100 <br />NA <br />NA <br />- Ripper attachment : <br />NA <br />NA <br />NA <br />NA <br />NA <br />NA <br />Ownership cost/hour: <br />$16.03 <br />$22.39 <br />NA <br />$22.39 <br />NA <br />NA <br />Operating cost/hour : <br />$41.48 <br />$2.50 <br />NA <br />$24.49 <br />NA <br />NA <br />Ripper op. cost/hour : <br />NA <br />NA <br />NA <br />NA <br />NA <br />NA <br />Operator cost/hour : <br />$22.29 <br />$38.54 <br />NA <br />$38.54 <br />NA <br />NA <br />Unit subtotals : <br />Number of units :1 <br />$79.79 <br />$63.43 <br />NA <br />$8541 <br />NA <br />NA <br />0 <br />1 <br />1 <br />0 <br />1 <br />0 <br />Group subtotals :1 <br />Work: $143.22 <br />Support: $85.41 <br />Maintenance : $0.00 <br />Total work team cost/hour: $228.63 <br />MATERIAL QUANTITIES <br />Initial Swell <br />volume: 37 CCY factor : 1.000 <br />Source of quantity take -off :Assume 100 sfX 10 ft hl( <br />Source of estimated swell factor: DRMS estimate <br />Material purchase cost : $0.00 /LCY <br />HOURLY PRODUCTION <br />Truck Capacity: <br />Loose <br />volume: 37 LCY <br />Total cost : $0 <br />Truck Payload (weight) Basis : <br />LCY <br />Truck Bed (volume) Basis <br />Material weight: <br />2,900 pounds /LCY <br />Struck volume <br />Descr.:Decomposed rock - 50% Rock, 50% Earth <br />Heaped volume: <br />Rated payload : <br />50,300 pounds <br />Average volume: <br />Payload capacity: <br />17.34 LCY <br />Adjusted volume ": <br />1.000 <br />Final truck volume based on number of loader passes <br />0.830 <br />truck volume adjusted to not exceed rated payload or heaped volume <br />Loading Tool Capacity: <br />Job Condition Corrections: <br />Rated capacity (nom. heaped) : <br />3.250 LCY <br />Truck <br />Descr. :Loose material - mixed <br />moist aggregates (95 -100 <br />Altitude adj.: <br />1.000 <br />Bucket fill factor : <br />0.975 <br />Job efficiency : <br />0.830 <br />Adjusted bucket capacity: <br />3.169 LCY <br />Net correction : <br />0.830 <br />12.00 <br />LCY <br />18.00 <br />LCY <br />15.00 <br />LCY <br />17.34 <br />LCY <br />15.84 <br />LCY <br />Site altitude (ft.) : <br />7,500 <br />Loader <br />Source <br />1.000 <br />(Cat HB) <br />(1 shift/day <br />0.830 <br />0.830 <br />