My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2010-01-29_REVISION - C1981035 (4)
DRMS
>
Day Forward
>
Revision
>
Coal
>
C1981035
>
2010-01-29_REVISION - C1981035 (4)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 3:59:07 PM
Creation date
4/25/2012 9:59:35 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981035
IBM Index Class Name
REVISION
Doc Date
1/29/2010
Doc Name
Reclamation Cost Estimate (King II)
Type & Sequence
MT6
Email Name
MLT
SLB
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
118
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CIRCES Cost Estimating Software <br />EQUIPMENT MOBILIZATION / DEMOBILIZATION <br />PROJECT IDENTIFICATION <br />Agency or organization name: Division Of Reclamation, Mining And Safety <br />Task # : 050 State : Colorado Permit/job #: C -81 -035 <br />Date: 0112612010 County:La Plata Abbreviation :none <br />User: TA Site: King li Mine Filename : C035 -050 <br />Permit or other job action :Midterm Review 6 <br />Task description :Mobilize equipment for majority of King ll Mine reclamation <br />EQUIPMENT TRANSPORT RIG COST Shift basis : 1 per day <br />Cost data source : CRG Data <br />Truck tractor description : Generic on- highway truck tractor, 6x4, diesel powered, 400 HP (2nd half, 200E <br />Truck trailer description : Generic folding gooseneck, drop deck equipment trailer (25T, 50T, and 100T) <br />Cost Breakdown <br />NON - ROADABLE EQUIPMENT <br />sheet 1 of 2 <br />Available rig capacities : <br />0 -25 Tons <br />26 -50 Tons <br />51+ Tons <br />Ownership cost/hour : <br />$16.63 <br />$18.37 <br />$22.33 <br />Operating cost/hour : <br />$44.38 <br />$46.13 <br />$50.07 <br />Operator cost/hour : <br />$27.66 <br />$27.66 <br />$27.66 <br />Helper cost/hour : <br />$0.00 <br />$25.39 <br />$25.39 <br />Total Unit Cost/hour : <br />$88.67 <br />$117.55 <br />$125.45 <br />Machine <br />Description <br />Weight/unit <br />(Tons) <br />Ownership <br />Cost/hr /unit <br />Haul Rig <br />Cost/hr /unit <br />Fleet Size <br />(No. units) <br />Haul Trip <br />Cost/hr /fleet <br />Return Trip DOT permit <br />Cost/hr /fleet Cost/fleet <br />-Cat D8R Series ll - 8S (201 <br />-CAT 938G (2003) <br />-CAT 12H <br />-Cat 322C L <br />-CAT 825G Series 11(2005) <br />52.55 <br />$46.56 <br />$125.45 <br />1 <br />$172.01 <br />$125.45 <br />$0.00 <br />$0.00 <br />$0.00 <br />$0.00 <br />$0.00 <br />14.45 <br />$22.39 <br />$88.67 <br />4 <br />$444.24 <br />$354.68 <br />14.41 <br />$22.18 <br />$88.67 <br />1 <br />$110.85 <br />$88.67 <br />26.68 <br />$33.62 <br />$117.55 <br />1 <br />$151.17 <br />$117.55 <br />36.08 <br />$54.43 <br />$117.55 <br />1 <br />$171.98 <br />$117.55 <br />Subtotals : <br />$1,050.26 <br />$803.90 <br />$0.00 <br />
The URL can be used to link to this page
Your browser does not support the video tag.