Demolition Work
<br />Project Identification
<br />Agency or organization
<br />name: Colorado Division of Reclamation, Mining and Safety
<br />Task #: 200
<br />Permitljob#:
<br />C -81 -035
<br />Date: 112912010
<br />Abbreviation:
<br />N/A
<br />User: TAK
<br />Site:
<br />King It Mine
<br />Filename:
<br />Permitting action: Midterin Pennit Review 2010
<br />Source of unit costs:
<br />CIRCES
<br />Task description: Demolish and remove all structures at King 11
<br />Mine
<br />Location adjustment:
<br />9950%
<br />Last unit
<br />cost update
<br />2009
<br />STRUCTURE or ITEM DESCRIPTION
<br />NO
<br />QUANTITY
<br />UNIT
<br />CIRCES DEMO MENU SELECTION
<br />UNIT COST TOTAL COST
<br />% LIAB
<br />TOTAL
<br />ft
<br />ft
<br />ft
<br />If in
<br />(100% LIAB)
<br />(ACTUAL)
<br />Water Storage Tank, 100,000 Gallon
<br />1
<br />Tank, diameter 24 It
<br />1
<br />13,333
<br />CF
<br />Demo /disp /exc pit - 10K haul
<br />$024
<br />$3,17325
<br />100%
<br />$3,17325
<br />Slab, circular, diameter 28 ft , 613 sf XO 75 If thick
<br />1
<br />248
<br />2476
<br />9
<br />613
<br />SF
<br />Demo disp exc pit, 8" th - 200 ft
<br />$231
<br />$1,416 16
<br />100 %,
<br />$1,416 16
<br />Water Storage Tank, 37,000 Gallon
<br />1
<br />Tank
<br />1
<br />4,933
<br />CF
<br />Demo/disp/exc pit - 10K' haul
<br />$024
<br />$1,174 05
<br />100%
<br />$1,17405
<br />Slab, 6" thick
<br />1
<br />32
<br />14
<br />6
<br />448
<br />SF
<br />Demo disp exc pit, 6" th - 200 ft
<br />$1 73
<br />$77504
<br />100%
<br />$77504
<br />Main Pump House
<br />1
<br />14
<br />10
<br />1267
<br />1,774
<br />CF
<br />Demo /disp /exc pit - 1OK' haul
<br />$024
<br />$42216
<br />100%
<br />$422 16
<br />Shop Equipment Wash Pad
<br />1
<br />Slab, 0 75' thick
<br />1
<br />50
<br />25
<br />9
<br />1,250
<br />SF
<br />Demo disp exis pit, 8" th - 200 ft
<br />$226
<br />$2,82500
<br />100%
<br />$2,82500
<br />Footers
<br />1
<br />2
<br />1
<br />150
<br />150
<br />LF
<br />Demo /disp /exc pit 1'X2' - 200 ft
<br />$694
<br />$1,041 00
<br />100%
<br />$1,041 00
<br />Shop Budding
<br />1
<br />Structure (metal)
<br />1
<br />60
<br />50
<br />16
<br />48,000
<br />CF
<br />Demo /disp /exc pit - 1OK' haul
<br />$024
<br />$11,42400
<br />100%
<br />$11,42400
<br />Slab 0 75 ft thick
<br />1
<br />60
<br />50
<br />9
<br />3,000
<br />SF
<br />Demo disp exis pit, 6" th - 200 ft
<br />$1 69
<br />$5,07000
<br />100%
<br />$5,07000
<br />Footers
<br />1
<br />2
<br />1
<br />220
<br />220
<br />LF
<br />Demo /disp /exc pit, 1'X2'- 200 It
<br />$694
<br />$1,52680
<br />100%
<br />$1,52680
<br />Mine Fan
<br />1
<br />Structure
<br />1
<br />286
<br />25
<br />10 5
<br />7,508
<br />CF
<br />Demo /disp /exc pit - 1OK' haul
<br />$024
<br />$1,786 79
<br />100%
<br />$1,78679
<br />Slab
<br />4
<br />8
<br />6
<br />48
<br />192
<br />SF
<br />Demo disp exc pit, 12" th - 200 ft
<br />$347
<br />$66624
<br />100%
<br />$66624
<br />Retaining Wall Adjacent to Main Fan
<br />1
<br />Structure, 1 ft thick
<br />1
<br />60
<br />8
<br />480
<br />SF
<br />Wall, concrete , demo only, ave reinf , 12" th
<br />$14 79
<br />$7,099 20
<br />1001%
<br />$7,099 20
<br />Footers
<br />1
<br />7
<br />1
<br />60
<br />60
<br />LF
<br />Demo /disp /existing pit, 2'X3'- 200 ft
<br />$2034
<br />$1,22040
<br />100%
<br />$1,22040
<br />Fan Portal
<br />1
<br />Structurelmetal)
<br />1
<br />30
<br />20
<br />8
<br />4,800
<br />CF
<br />Dernoidisp /exc pit - 1 OK' haul
<br />$024
<br />$1,14240
<br />100%
<br />$1,14240
<br />Slab
<br />1
<br />30
<br />20
<br />12
<br />600
<br />SF
<br />Demo disp exc pit, 12" th - 200 If
<br />$347
<br />$2,08200
<br />100%
<br />$2,08200
<br />Footers
<br />1
<br />0 75
<br />4
<br />100
<br />100
<br />LF
<br />Demo /disp /exc pit, 1 5'X3'- 200 ft
<br />$1561
<br />$1,561 00
<br />100%
<br />$1,561 00
<br />Travelway Portal
<br />1
<br />Structure (metal, no floor)
<br />1
<br />30
<br />20
<br />8
<br />4,800
<br />CF
<br />Demo /disp /exc pit - 1OK' haul
<br />$024
<br />$1,14240
<br />100%
<br />$1,14240
<br />Footers
<br />1
<br />14
<br />1
<br />60
<br />60
<br />SF
<br />Demo disp exc pit, 12" th - 200 ft
<br />$347
<br />$20820
<br />100%
<br />$20820
<br />Portal Motor Control Center (Portal MCC)
<br />1
<br />Structure (metal)
<br />1
<br />14
<br />10
<br />12 67
<br />1,774
<br />CF
<br />Demo /disp /exc pit - 1 OK' haul
<br />$024
<br />$422 16
<br />100%
<br />$422 16
<br />Slab
<br />1
<br />14
<br />10
<br />6
<br />140
<br />SF
<br />Demo disp exc pit, 6" th - 200 ft
<br />$1 73
<br />$24220
<br />100%
<br />$24220
<br />Footers
<br />1
<br />2
<br />48
<br />48
<br />LF
<br />Demo /disp /exc pit, 1'X2' - 200 If
<br />$694
<br />$333 12
<br />100%
<br />$333 12
<br />
|