Laserfiche WebLink
Demolition Work <br />Project Identification <br />Agency or organization <br />name: Colorado Division of Reclamation, Mining and Safety <br />Task #: 200 <br />Permitljob#: <br />C -81 -035 <br />Date: 112912010 <br />Abbreviation: <br />N/A <br />User: TAK <br />Site: <br />King It Mine <br />Filename: <br />Permitting action: Midterin Pennit Review 2010 <br />Source of unit costs: <br />CIRCES <br />Task description: Demolish and remove all structures at King 11 <br />Mine <br />Location adjustment: <br />9950% <br />Last unit <br />cost update <br />2009 <br />STRUCTURE or ITEM DESCRIPTION <br />NO <br />QUANTITY <br />UNIT <br />CIRCES DEMO MENU SELECTION <br />UNIT COST TOTAL COST <br />% LIAB <br />TOTAL <br />ft <br />ft <br />ft <br />If in <br />(100% LIAB) <br />(ACTUAL) <br />Water Storage Tank, 100,000 Gallon <br />1 <br />Tank, diameter 24 It <br />1 <br />13,333 <br />CF <br />Demo /disp /exc pit - 10K haul <br />$024 <br />$3,17325 <br />100% <br />$3,17325 <br />Slab, circular, diameter 28 ft , 613 sf XO 75 If thick <br />1 <br />248 <br />2476 <br />9 <br />613 <br />SF <br />Demo disp exc pit, 8" th - 200 ft <br />$231 <br />$1,416 16 <br />100 %, <br />$1,416 16 <br />Water Storage Tank, 37,000 Gallon <br />1 <br />Tank <br />1 <br />4,933 <br />CF <br />Demo/disp/exc pit - 10K' haul <br />$024 <br />$1,174 05 <br />100% <br />$1,17405 <br />Slab, 6" thick <br />1 <br />32 <br />14 <br />6 <br />448 <br />SF <br />Demo disp exc pit, 6" th - 200 ft <br />$1 73 <br />$77504 <br />100% <br />$77504 <br />Main Pump House <br />1 <br />14 <br />10 <br />1267 <br />1,774 <br />CF <br />Demo /disp /exc pit - 1OK' haul <br />$024 <br />$42216 <br />100% <br />$422 16 <br />Shop Equipment Wash Pad <br />1 <br />Slab, 0 75' thick <br />1 <br />50 <br />25 <br />9 <br />1,250 <br />SF <br />Demo disp exis pit, 8" th - 200 ft <br />$226 <br />$2,82500 <br />100% <br />$2,82500 <br />Footers <br />1 <br />2 <br />1 <br />150 <br />150 <br />LF <br />Demo /disp /exc pit 1'X2' - 200 ft <br />$694 <br />$1,041 00 <br />100% <br />$1,041 00 <br />Shop Budding <br />1 <br />Structure (metal) <br />1 <br />60 <br />50 <br />16 <br />48,000 <br />CF <br />Demo /disp /exc pit - 1OK' haul <br />$024 <br />$11,42400 <br />100% <br />$11,42400 <br />Slab 0 75 ft thick <br />1 <br />60 <br />50 <br />9 <br />3,000 <br />SF <br />Demo disp exis pit, 6" th - 200 ft <br />$1 69 <br />$5,07000 <br />100% <br />$5,07000 <br />Footers <br />1 <br />2 <br />1 <br />220 <br />220 <br />LF <br />Demo /disp /exc pit, 1'X2'- 200 It <br />$694 <br />$1,52680 <br />100% <br />$1,52680 <br />Mine Fan <br />1 <br />Structure <br />1 <br />286 <br />25 <br />10 5 <br />7,508 <br />CF <br />Demo /disp /exc pit - 1OK' haul <br />$024 <br />$1,786 79 <br />100% <br />$1,78679 <br />Slab <br />4 <br />8 <br />6 <br />48 <br />192 <br />SF <br />Demo disp exc pit, 12" th - 200 ft <br />$347 <br />$66624 <br />100% <br />$66624 <br />Retaining Wall Adjacent to Main Fan <br />1 <br />Structure, 1 ft thick <br />1 <br />60 <br />8 <br />480 <br />SF <br />Wall, concrete , demo only, ave reinf , 12" th <br />$14 79 <br />$7,099 20 <br />1001% <br />$7,099 20 <br />Footers <br />1 <br />7 <br />1 <br />60 <br />60 <br />LF <br />Demo /disp /existing pit, 2'X3'- 200 ft <br />$2034 <br />$1,22040 <br />100% <br />$1,22040 <br />Fan Portal <br />1 <br />Structurelmetal) <br />1 <br />30 <br />20 <br />8 <br />4,800 <br />CF <br />Dernoidisp /exc pit - 1 OK' haul <br />$024 <br />$1,14240 <br />100% <br />$1,14240 <br />Slab <br />1 <br />30 <br />20 <br />12 <br />600 <br />SF <br />Demo disp exc pit, 12" th - 200 If <br />$347 <br />$2,08200 <br />100% <br />$2,08200 <br />Footers <br />1 <br />0 75 <br />4 <br />100 <br />100 <br />LF <br />Demo /disp /exc pit, 1 5'X3'- 200 ft <br />$1561 <br />$1,561 00 <br />100% <br />$1,561 00 <br />Travelway Portal <br />1 <br />Structure (metal, no floor) <br />1 <br />30 <br />20 <br />8 <br />4,800 <br />CF <br />Demo /disp /exc pit - 1OK' haul <br />$024 <br />$1,14240 <br />100% <br />$1,14240 <br />Footers <br />1 <br />14 <br />1 <br />60 <br />60 <br />SF <br />Demo disp exc pit, 12" th - 200 ft <br />$347 <br />$20820 <br />100% <br />$20820 <br />Portal Motor Control Center (Portal MCC) <br />1 <br />Structure (metal) <br />1 <br />14 <br />10 <br />12 67 <br />1,774 <br />CF <br />Demo /disp /exc pit - 1 OK' haul <br />$024 <br />$422 16 <br />100% <br />$422 16 <br />Slab <br />1 <br />14 <br />10 <br />6 <br />140 <br />SF <br />Demo disp exc pit, 6" th - 200 ft <br />$1 73 <br />$24220 <br />100% <br />$24220 <br />Footers <br />1 <br />2 <br />48 <br />48 <br />LF <br />Demo /disp /exc pit, 1'X2' - 200 If <br />$694 <br />$333 12 <br />100% <br />$333 12 <br />