Laserfiche WebLink
sheet 1 of 2 <br />CIRCES Cost Estimatina Software <br />TRUCK/LOADER TEAM WORK <br />PROJECT IDENTIFICATION <br />Truck/Loader Work Team <br />Truck Loading Tool <br />Support Equipment <br />Load Area Dump Area <br />Agency or organization name: DRMS <br />Import data filename : <br />Task #: 065 <br />State : Colorado <br />Permit/job # : C -81 -035 <br />Date : 0112112010 <br />County :La Plata <br />Abbreviation :none <br />User: TAK <br />Site: King li Mine <br />Filename : C035 -065 <br />Permit or other job action <br />:Midterm Permit Review 2010 <br />NA <br />Task description: <br />Haul sediment from pond cleaning to waste pile at King I site <br />NA <br />HOURLY EQUIPMENT COST <br />NA <br />Shift basis : 1 per day <br />NA <br />NA <br />Fouinment Descnntion <br />$16.03 <br />Truck/loader team -Truck :Generic 12 -18 cy, 6x4 <br />- Loader :I CAT 938G (2003) <br />Support equipment -Load area :NA _ <br />-Dump area : CAT 938G (2003) <br />Road maintenance -Motor grader :NA <br />-Water truck :,NA <br />Cost Breakdown : <br />Truck/Loader Work Team <br />Truck Loading Tool <br />Support Equipment <br />Load Area Dump Area <br />Road Maintenance Equipment <br />Motor Grader Water Truck <br />Import data filename : <br />truck2 <br />loader <br />NA <br />loader <br />NA <br />NA <br />% Utilization-machine: <br />100 <br />61 <br />NA <br />100 <br />NA <br />NA <br />- Ripper attachment : <br />NA <br />NA <br />NA <br />NA <br />NA <br />NA <br />Ownership cost/hour : <br />$16.03 <br />$22.39 <br />NA <br />$22.39 <br />NA <br />NA <br />Operating cost/hour : <br />$4148 <br />$15.02 <br />NA <br />$24.49 <br />NA <br />NA <br />Ripper op. cost/hour : <br />NA <br />NA <br />NA <br />NA <br />NA <br />NA <br />Operator cost/hour : <br />$2229 <br />$3854 <br />NA <br />$38.54 <br />NA <br />NA <br />Unit subtotals : <br />Number of units :1 <br />$79.79 <br />$75.95 <br />NA <br />$85.41 <br />NA <br />NA <br />0 <br />6 <br />1 <br />0 <br />1 <br />0 <br />Group subtotals :1 <br />Work: $554.69 <br />Support : $85.41 <br />Maintenance : $0.00 <br />Total work team cost/hour: $640.10 <br />MATERIAL QUANTITIES <br />Initial Swell Loose <br />volume: 6,453 LCY factor : NA volume: 6,453 LCY <br />Source of quantity take -off :2 pond cleanings in 10 years @ 2 acre -feet of sediment each <br />Source of estimated swell factor: NA <br />Material purchase cost : $0.00 /LCY Total cost : $0 <br />HOURLY PRODUCTION <br />Truck Capacity: <br />Truck Payload (weight) Basis <br />Truck Bed (volume) Basis : <br />Material weight: <br />2,700 pounds /LCY <br />Struck volume <br />Descr.:Earth - Wet excavated <br />0.830 <br />Heaped volume <br />Rated payload <br />: 50,300 pounds <br />Average volume <br />Payload capacity: <br />18.63 LCY <br />Adjusted volume* <br />Final truck volume based on number of loader passes <br />truck volume adjusted to not exceed rated payload or heaped volume <br />Loadina Tool Capacity: <br />Job Condition Corrections: <br />Rated capacity (nom. heaped) <br />: 3.250 LCY <br />Truck <br />Descr. :Loose material - mixed <br />moist aggregates (95 -100 <br />Altitude adj.: <br />1.000 <br />Bucket fill factor <br />: 0.975 <br />Job efficiency: <br />0.830 <br />Adjusted bucket capacity <br />: 3.169 LCY <br />Net correction : <br />0.830 <br />12.00 LCY <br />18.00 LCY <br />1500 LCY <br />18.00 LCY <br />15.84 LCY <br />Site altitude (ft.) : 7,500 <br />Loader <br />Source <br />1.000 <br />(Cat HB) <br />(1 shift/day) <br />0.830 <br />0.830 <br />