Laserfiche WebLink
PROJECT IDENTIFICATION <br />Task #: 010 <br />Date : 0112612010 <br />User: TA <br />CIRCES Cost Estimating Software <br />MOTOR GRADER WORK <br />State :Colorado <br />County :La Plata <br />Site :Kina I Mine <br />Permit/job #: C -81 -035 <br />Abbreviation :none <br />Filename :C035 -010 <br />Agency or organization name: Division Of Reclamation, Mining And Safety <br />Permit or other job action :Midterm Permit Review 6 <br />Task description: Rip and final grade lower faciliities area <br />HOURLY EQUIPMENT COST <br />Basic machine: CAT 12H <br />Horsepower: 140 <br />Attachment no. 1 :NA Shift basis <br />Attachment no. 2 : Multi -shank ripper <br />Data source <br />Utilization % <br />Cost Breakdown Ownership cost/hour: $24.18 NA <br />Grader operating cost/hour: $38.26 100 <br />Ripper operating cost/hour: $0.47 25 <br />Operator cost/hour: $24.50 NA <br />Total unit cost/hour : $87.41 Total fleet cost/hour <br />MATERIAL QUANTITIES <br />Total area to be graded or ripped : 1.18 acres <br />Source of estimated acreage : TR -9 submittal <br />HOURLY PRODUCTION <br />Selected application :Finish grading (0 -2.5 mph) <br />Average grader speed : <br />1.25 <br />mph <br />Selected blade angle : <br />30 <br />degrees <br />Effective blade length : <br />10.40 <br />feet <br />Width of blade overlap per pass: <br />2.00 <br />feet <br />Net grading or ripping width per pass : <br />8.40 <br />feet <br />Unadjusted hourly unit production : <br />1.2727 <br />acres /hour <br />Job Condition Correction Factors <br />Average site altitude : 7,400 feet <br />' at 0 degrees, blade is perpendicular <br />to direction of travel. <br />width of ripper beam on ripping applications <br />1 per day <br />(CRG) <br />Q .Q7 d4 <br />Source <br />Altitude adjustment factor: 0.83 (Cat HB) <br />Job efficiency adjustment factor: 0.85 (1 sh /d, mod.) <br />Net job correction : 0.7055 multiplier <br />Adjusted hourly unit production : 0.8979 acres /hour <br />Adjusted hourly fleet production : 0.8979 acres /hour <br />JOB TIME AND COST <br />Fleet size : 1 grader(s) <br />Unit cost: $97.35 per acre <br />Total job time <br />Total job cost <br />1.31 hours <br />$115 <br />