Laserfiche WebLink
PROJECT IDENTIFICATION <br />Task # : 005 <br />Date : 0112512010 <br />User: TA <br />CIRCES Cost Estimating Software <br />MOTOR GRADER WORK <br />State : Colorado <br />County: La Plata <br />Site: Kinq / Mine <br />Permit/job #: C -81 -035 <br />Abbreviation :none <br />Filename : C035 -005 <br />Agency or organization name: DRMS <br />Permit or other job action : Midterm Permit Review 2010 <br />Task description :Finish -grade Upper Facilities Area <br />HOURLY EQUIPMENT COST <br />Basic machine: CAT 12H <br />Attachment no. 1 : NA <br />Attachment no. 2 : Multi -shank ripper <br />Cost Breakdown Ownership cost/hour : <br />Grader operating cost/hour : <br />Ripper operating cost/hour : <br />Operator cost/hour : <br />Total unit cost/hour : <br />Horsepower: 140 <br />Shift basis : 1 per day <br />Data source : (CRG) <br />Utilization % <br />$24.18 NA <br />$38.26 100 <br />$0.00 0 <br />$24.50 NA <br />$86.94 Total fleet cost/hour : $86.94 <br />MATERIAL QUANTITIES <br />Total area to be graded or ripped : 1.96 acres <br />Source of estimated acreage :Section 2.05.3 of permit application <br />HOURLY PRODUCTION <br />Selected application :Finish grading (0 -2.5 mph) <br />Average grader speed : <br />1.25 <br />mph <br />Selected blade angle : <br />30 <br />degrees * <br />at 0 degrees, blade is perpendicular <br />Effective blade length : <br />10.40 <br />feet <br />to direction of travel. <br />Width of blade overlap per pass : <br />2.00 <br />feet <br />Net grading or ripping width per pass : <br />8.40 <br />feet <br />width of ripper beam on <br />ripping applications <br />Unadjusted hourly unit production : <br />1.2727 <br />acres /hour <br />Job Condition Correction Factors <br />Source <br />Average site altitude : 7,400 <br />feet <br />Altitude adjustment factor : <br />0.83 <br />(Cat HB) <br />Job efficiency adjustment factor: <br />0.85 <br />(1sh 1d, mod.) <br />Net job correction : <br />0.7055 <br />multiplier <br />Adjusted hourly unit production : <br />0.8979 <br />acres /hour <br />Adjusted hourly fleet production : <br />0.8979 <br />acres /hour <br />JOB TIME AND COST <br />Fleet size : 1 <br />grader(s) <br />Total job time : <br />2.18 <br />hours <br />Unit cost : $96.82 <br />per acre <br />Total job cost: <br />$190 <br />