Laserfiche WebLink
sheet 1 of 2 <br />CIRCES Cost Estimating Software <br />TRUCK/LOADER TEAM WORK <br />PROJECT IDENTIFICATION <br />Agency or organization name :DRMS <br />Task #: 004 State : Colorado Permit/job # : C -81 -035 <br />Date : 0112512010 County :La Plata Abbreviation :none <br />User : TAK Site: King I Mine Filename : C035 -004 <br />Permit or other job action :Midterm Permit Review 2010 <br />Task description: Haul topsoil /growth medium to Upper Facilities Area <br />HOURLY EQUIPMENT COST Shift basis: 1 per day <br />�Eauipment Description <br />Truck/loader team -Truck: <br />-Loader: <br />Generic 10 -12 cy, 6x4 <br />CAT 938G (2003) <br />Support equipment -Load area: <br />-Dump area: <br />NA <br />_ <br />NA <br />Road maintenance -Motor grader: <br />-Water truck : <br />NA <br />NA <br />Cost Breakdown : <br />Truck/Loader <br />Truck <br />Work Team <br />Loading Tool <br />Support Equipment <br />Load Area I Dump Area <br />Road Maintenance Equipment <br />Motor Grader Water Truck <br />Import data filename : <br />truck2 <br />loader <br />NA <br />NA <br />NA <br />NA <br />% Utilization-machine: <br />97 <br />100 <br />NA <br />NA <br />NA <br />NA <br />- Ripper attachment : <br />NA <br />NA <br />NA <br />NA <br />NA <br />NA <br />Ownership cost/hour: <br />$13.34 <br />$22.39 <br />NA <br />NA <br />NA <br />NA <br />Operating cost/hour : <br />$37.91 <br />$24.49 <br />NA <br />NA <br />NA <br />NA <br />Ripper op. cost/hour: <br />NA <br />NA <br />NA <br />NA <br />NA <br />NA <br />Operator cost/hour : <br />$22.29 <br />$38.54 <br />NA <br />NA <br />NA <br />NA <br />Unit subtotals : <br />Number of units :1 <br />$73.54 <br />$85.41 <br />NA <br />NA <br />NA <br />NA <br />0 <br />2 <br />1 <br />0 <br />0 <br />0 <br />Group subtotals :1 <br />Work: $232.49 <br />Support : $0.00 <br />Maintenance: $0.00 <br />Total work team cost/hour: $232.49 <br />MATERIAL QUANTITIES <br />Initial Swell <br />Loose <br />volume: 1,581 CCY factor : <br />1.165 volume: <br />1,842 <br />Source of quantity take -off :1.96 acres X 6" thick <br />Source of estimated swell factor: DRMS estimate <br />Material purchase cost : $0.00 <br />/LCY Total cost : <br />$0 <br />HOURLY PRODUCTION <br />Truck Capacity: <br />Truck Payload (weight) Basis : <br />Truck Bed (volume) Basis <br />Material weight: 2,850 pounds /LCY <br />Struck volume : <br />10.00 <br />Descr.: Gravel - Dry (114 " -2 'dram.) <br />Heaped volume: <br />12.00 <br />Rated payload : 35,400 pounds <br />Average volume: <br />11.00 <br />Payload capacity : 12.42 LCY <br />Adjusted volume': <br />12.00 <br />Final truck volume based on number of loader passes : <br />9.50 <br />truck volume adjusted to not exceed rated payload or heaped volume <br />Loading Tool Capacity: <br />Job Condition Corrections : <br />Site altitude (ft.) <br />Rated capacity (nom. heaped) : 3.250 LCY <br />Truck <br />Loader <br />Descr. :Loose material -mixed moist aggregates (95 -100 <br />Altitude adj.: <br />1.000 <br />1.000 <br />Bucket fill factor : 0.975 <br />Job efficiency: <br />0.830 <br />0.830 <br />Adjusted bucket capacity : 3.169 LCY <br />Net correction : <br />0.830 <br />0.830 <br />LCY <br />LCY <br />LCY <br />LCY <br />LCY <br />LCY <br />7,500 <br />Source <br />(Cat HB) <br />shift/day) <br />