Laserfiche WebLink
Page 55 of 164 <br />Haul Route: <br />Seg # <br />Haul Distance <br />Grade ( %) <br />Roll. Res <br />Total Res <br />Velocity <br />Travel <br />(Ft) <br />( %) <br />( %) <br />(fpm) <br />Time <br />1 <br />2000.00 <br />- 3.00 <br />3.00 <br />0.00 <br />4254 <br />0.945 <br />Haul Time: 0.945 minutes <br />Return Route: <br />Seg # <br />Haul Distance <br />Grade ( %) <br />Roll. Res <br />Total Res <br />Velocity <br />Travel <br />(Ft) <br />( %) <br />( %) <br />(fpm) <br />(min) <br />1 <br />2000.00 <br />3.00 <br />3.00 <br />6.00 <br />2851 <br />0.929 <br />Loading Tool unit <br />Production 715.91 <br />Truck Unit Production <br />310.41 <br />Optimal No. of Trucks: 2 <br />JOB TIME AND COST <br />Fleet size: <br />Unit cost: <br />Return Time: 0.929 <br />Total Trick Cycle Time: 5.074 <br />LCY/Hour Adjusted for job efficiency: <br />LCY/Hour Adjusted for job efficiency: <br />Truck(s) Selected Number of Trucks: <br />Adjusted hourly truck team production: 515.27 <br />Adjusted single truck/loader team production: 51527 <br />Adjusted multiple truck/loader team production: 515.27 <br />1 Team(s) <br />$0.899 /LCY <br />LCY/Hour <br />LCY/Hour <br />Total job time: 7.12 Hours <br />Total job cost: $3,299.08 <br />minutes <br />minutes <br />594.20 LCY/Hour <br />257.64 LCY/Hour <br />2 Truck(s) <br />LCY/Hour <br />CIRCES Cost Estimating Software <br />