Laserfiche WebLink
TRUCK/LOADER TEAM WORK <br />Task description: Remove Parking Lot and Access Road Pavement <br />Site: Deserado Mine Permit Action: 2012 Midterm Review Permit/Job #: C1981018 <br />User: JDM <br />Agency or organization name: DRMS <br />HOURLY EQUIPMENT COST <br />Task #: 042 State: Colorado <br />Date: 4 /5/2012 County: Rio Blanco <br />PROJECT IDENTIFICATION <br />ipti <br />Truck Loader Team - Trick: Cat 769D <br />- Loader: CAT 980H <br />Support Equipment -Load Area: <br />NA <br />-Dump Area: <br />NA <br />Road Maintenance —Motor Grader: <br />NA <br />-Water Truck: <br />NA <br />Cost Breakdown: Truck/Loader Team Sunnort Eaninment Maintenance Eaninment <br />Total work team cost/hour: $463.07 <br />MATERIAL QUANTITIES <br />Initial volume: 3,671 CCY Swell factor: 1.000 <br />Loose volume: 3,671 LCY <br />Source of estimated volume: Division of Reclamation, Mining & Safety <br />Source of estimated swell factor: Cat Handbook <br />Material Purchase Cost: $0.00 <br />Total Cost: $0.00 <br />HOURLY PRODUCTION <br />Truck Capacity: <br />Truck Payload (weight) Basis: <br />Material weight: 2,950 <br />Description: Slag - broken <br />Rated Payload: 82,000 <br />Payload Capacity: 27.80 <br />Pounds/LCY <br />Pounds <br />LCY <br />Shift basis: 1 per day <br />Abbreviation: None <br />Filename: C018 -042 <br />Trick <br />Loader <br />Load Area <br />Dump Area <br />Motor Grader <br />Water Truck <br />%Utilization- machine: <br />100 <br />90 <br />NA <br />NA <br />NA <br />NA <br />Ownership cost /hour: <br />$43.04 <br />$44.85 <br />NA <br />NA <br />NA <br />NA <br />Operating cost/hour: <br />$91.48 <br />$65.93 <br />NA <br />NA <br />NA <br />NA <br />Ripper op. cost /hour: <br />NA <br />$0.00 <br />NA <br />NA <br />NA <br />NA <br />Operator cost/hour: <br />$22.29 <br />$38.67 <br />NA <br />NA <br />NA <br />NA <br />Unit Subtotals: <br />$156.81 <br />$149.45 <br />NA <br />NA <br />NA <br />NA <br />Number of Units: <br />2 <br />1 <br />0 <br />0 <br />0 <br />0 <br />Group Subtotals: <br />Work: $463.07 <br />Support: $0.00 <br />Maine $0.00 <br />Total work team cost/hour: $463.07 <br />MATERIAL QUANTITIES <br />Initial volume: 3,671 CCY Swell factor: 1.000 <br />Loose volume: 3,671 LCY <br />Source of estimated volume: Division of Reclamation, Mining & Safety <br />Source of estimated swell factor: Cat Handbook <br />Material Purchase Cost: $0.00 <br />Total Cost: $0.00 <br />HOURLY PRODUCTION <br />Truck Capacity: <br />Truck Payload (weight) Basis: <br />Material weight: 2,950 <br />Description: Slag - broken <br />Rated Payload: 82,000 <br />Payload Capacity: 27.80 <br />Pounds/LCY <br />Pounds <br />LCY <br />Shift basis: 1 per day <br />Abbreviation: None <br />Filename: C018 -042 <br />