Laserfiche WebLink
Job efficiency: <br />Spoil pile: <br />Push gradient: <br />Altitude: <br />Material Weight: <br />Blade type: <br />0.830 <br />(1 SHIFT/DAY) <br />0.900 <br />(SSD -FC) <br />1.000 <br />(CAT HB) <br />1.000 <br />(CAT HB) <br />O.838 <br />(CAT HB) <br />1.000 <br />(PAT) <br />Net correction: 0.4695 <br />Adjusted unit production: 583.68 LCY/hr <br />Adjusted fleet production: 2334.72 LCY/hr <br />JOB TIME AND COST <br />Fleet size: 4 Dozer(s) <br />Unit cost: $0.444/LCY <br />Total job time <br />Total job cost <br />0.69 Hours <br />5720.75 <br />Page 29 of 164 <br />CIRCES Cost Estimating Software <br />