Laserfiche WebLink
Page 25 of 164 <br />Haul Route: <br />Seg # <br />Haul Distance <br />Grade ( %) <br />Roll. Res <br />Total Res <br />Velocity <br />Travel <br />(Ft) <br />( %) <br />( %) <br />(fpm) <br />Time <br />1 <br />5000.00 <br />3.00 <br />1.20 <br />4.20 <br />2051 <br />2.704 <br />Haul Time: 2.704 minutes <br />Return Route: <br />Seg # <br />Haul Distance <br />Grade ( %) <br />Roll. Res <br />Total Res <br />Velocity <br />Travel <br />(Ft) <br />( %) <br />( %) <br />(fpm) <br />(min) <br />1 <br />5000.00 <br />-3.00 <br />1.20 <br />-1.80 <br />4254 <br />1.212 <br />Loading Tool unit <br />Production 715.91 <br />Truck Unit Production <br />221.33 <br />Optimal No. of Trucks: 3 <br />JOB TIME AND COST <br />Fleet size: <br />Unit cost: <br />Return Time: 1.212 <br />Total Trick Cycle Time: 7.116 <br />LCY/Hour Adjusted for job efficiency: <br />LCY/Hour Adjusted for job efficiency: <br />Truck(s) Selected Number of Trucks: <br />Adjusted hourly truck team production: 551.12 <br />Adjusted single truck/loader team production: 551.12 <br />Adjusted multiple truck/loader team production: 551.12 <br />1 Team(s) <br />$1.131 /LCY <br />Total job time: <br />Total job cost: <br />minutes <br />minutes <br />594.20 LCY/Hour <br />183.71 LCY/Hour <br />3 Truck(s) <br />LCY/Hour <br />LCY/Hour <br />LCY/Hour <br />2.02 Hours <br />S1.257.02 <br />CIRCES Cost Estimating Software <br />