My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2012-04-23_REVISION - C1981018
DRMS
>
Day Forward
>
Revision
>
Coal
>
C1981018
>
2012-04-23_REVISION - C1981018
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 4:56:44 PM
Creation date
4/25/2012 7:54:23 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981018
IBM Index Class Name
Revision
Doc Date
4/23/2012
Doc Name
2012 Midterm Review Cost Estimate & Adequacy Questions
From
Jason Musick
To
Zack Trujillio
Type & Sequence
MT6
Email Name
JDM
DIH
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
167
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
TRUCK/LOADER TEAM WORK <br />Task description: <br />Site: Deserado Mine <br />Recontour CR65 Intersection <br />Permit Action: 2012 Midterm Review Permit/Job #: C1981018 <br />User: JDM <br />Agency or organization name: DRMS <br />HOURLY EQUIPMENT COST <br />Task #: 010 State: Colorado <br />Date: 4 /5/2012 County: Rio Blanco <br />PROJECT IDENTIFICATION <br />ipti <br />Truck Loader Team - Trick: Cat 769D <br />- Loader: CAT 980H <br />Support Equipment -Load Area: <br />NA <br />-Dump Area: <br />NA <br />Road Maintenance —Motor Grader: <br />NA <br />-Water Truck: <br />NA <br />Cost Breakdown: Truck/Loader Team Sunnort Eaninment Maintenance Eaninment <br />Total work team cost/hour: $623.55 <br />MATERIAL QUANTITIES <br />Initial volume: 1,000 CCY Swell factor: 1.111 <br />Loose volume: 1,111 LCY <br />Source of estimated volume: Division of Reclamation, Mining & Safety <br />Source of estimated swell factor: Operator Study <br />Material Purchase Cost: $0.00 <br />Total Cost: $0.00 <br />HOURLY PRODUCTION <br />Truck Capacity: <br />Truck Payload (weight) Basis: <br />Material weight: 2,743 Pounds/LCY <br />Description: User Provided <br />Rated Pavload: 82,000 Pounds <br />Payload Capacity: 29.89 LCY <br />Shift basis: 1 per day <br />Abbreviation: None <br />Filename: C018 -010 <br />Trick <br />Loader <br />Load Area <br />Dump Area <br />Motor Grader <br />Water Truck <br />%Utilization- machine: <br />100 <br />95 <br />NA <br />NA <br />NA <br />NA <br />Ownership cost /hour: <br />$43.04 <br />$44.85 <br />NA <br />NA <br />NA <br />NA <br />Operating cost/hour: <br />$91.48 <br />$69.59 <br />NA <br />NA <br />NA <br />NA <br />Ripper op. cost /hour: <br />NA <br />$0.00 <br />NA <br />NA <br />NA <br />NA <br />Operator cost/hour: <br />$22.29 <br />$38.67 <br />NA <br />NA <br />NA <br />NA <br />Unit Subtotals: <br />$156.81 <br />$153.12 <br />NA <br />NA <br />NA <br />NA <br />Number of Units: <br />3 <br />1 <br />0 <br />0 <br />0 <br />0 <br />Group Subtotals: <br />Work: $623.55 <br />Support: $0.00 <br />Maine $0.00 <br />Total work team cost/hour: $623.55 <br />MATERIAL QUANTITIES <br />Initial volume: 1,000 CCY Swell factor: 1.111 <br />Loose volume: 1,111 LCY <br />Source of estimated volume: Division of Reclamation, Mining & Safety <br />Source of estimated swell factor: Operator Study <br />Material Purchase Cost: $0.00 <br />Total Cost: $0.00 <br />HOURLY PRODUCTION <br />Truck Capacity: <br />Truck Payload (weight) Basis: <br />Material weight: 2,743 Pounds/LCY <br />Description: User Provided <br />Rated Pavload: 82,000 Pounds <br />Payload Capacity: 29.89 LCY <br />Shift basis: 1 per day <br />Abbreviation: None <br />Filename: C018 -010 <br />
The URL can be used to link to this page
Your browser does not support the video tag.