Laserfiche WebLink
6. Monitoring Reclamation Success <br />Reclamation success will be based on the successful establishment of vegetation over all disturbed areas <br />of the Yule Quarry. The operator plans to use the local NRCS office to assist in determining the ability <br />of the reclaimed land to control erosion and any to make suggestions which may enhance the <br />reclamation of the site. If minor changes or modifications are needed to the seeding and reclamation <br />plan, revision plans will be submitted to the Division of Reclamation, Mining, and Safety as required. It <br />is hoped that the Division will provide assistance in evaluating the success of the ongoing reclamation <br />process. All areas disturbed and reclaimed and any other important items regarding the reclamation will <br />be submitted in the annual reports to the Division. <br />Yule Quarry April 2012 50 <br />