Laserfiche WebLink
Truck Travel (Haul & Return) Time: <br />maintained 3.0 <br />Haul Route: <br />Road Condition: Firm, smooth, rolling, dirt/It. surfaced, watered, <br />Seg # <br />Haul Distance <br />(Ft) <br />Grade ( %) <br />Roll. Res <br />( %) <br />Total Res <br />( %) <br />Velocity <br />(fpm) <br />Travel <br />Time <br />min <br />1 <br />3000.00 <br />2.00 <br />3.00 <br />5.00 <br />1550 <br />2.142 <br />Haul Time: 2.142 minutes <br />Return Route: <br />JOB TIME AND COST <br />Fleet size: 1 Team(s) <br />Unit cost: $1.507 /LCY <br />Total job time: 17.34 Hours <br />Total job cost: $35,334.50 <br />CIRCES Cost Estimating Software <br />Seg # <br />Haul Distance <br />(Ft) <br />Grade ( %) <br />Roll. Res <br />( %) <br />Total Res <br />( %) <br />Velocity <br />(fpm) <br />Travel <br />Time <br />min <br />Production <br />1 <br />3000.00 <br />-2.00 <br />3.00 <br />1.00 <br />3503 <br />1.049 <br />487.41 LCY/Hour <br />JOB TIME AND COST <br />Fleet size: 1 Team(s) <br />Unit cost: $1.507 /LCY <br />Total job time: 17.34 Hours <br />Total job cost: $35,334.50 <br />CIRCES Cost Estimating Software <br />Return Time: 1.049 <br />minutes <br />Total Truck Cycle Time: 6.866 <br />minutes <br />Loading Tool unit <br />Production <br />1,629.09 LCY/Hour Adjusted for job efficiency: <br />1,352.15 LCY/Hour <br />Truck Unit Production <br />587.24 LCY/Hour Adjusted for job efficiency: <br />487.41 LCY/Hour <br />Optimal No. of Trucks: <br />3 Truck(s) Selected Number of Trucks: <br />3 Truck(s) <br />Adjusted hourly truck team production: 1,462.23 <br />LCY/Hour <br />Adjusted single truck/loader team production: 1,352.15 <br />LCY/Hour <br />Adjusted multiple truck/loader team production: 1,352.15 <br />LCY/Hour <br />JOB TIME AND COST <br />Fleet size: 1 Team(s) <br />Unit cost: $1.507 /LCY <br />Total job time: 17.34 Hours <br />Total job cost: $35,334.50 <br />CIRCES Cost Estimating Software <br />