My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2012-04-24_APPLICATION CORRESPONDENCE - C2010089
DRMS
>
Day Forward
>
Application Correspondence
>
Coal
>
C2010089
>
2012-04-24_APPLICATION CORRESPONDENCE - C2010089
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 4:56:45 PM
Creation date
4/24/2012 10:46:36 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C2010089
IBM Index Class Name
Application Correspondence
Doc Date
4/24/2012
Doc Name
Reclamation Cost Estimate (Emailed)
From
Jim Stark
To
Marcia Talvitie
Email Name
JRS
MLT
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
142
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
BLASTING MATERIALS QUANTITIES <br />HOURLY EQUIPMENT COST <br />Shift basis: 1 per day <br />Drilling Equipment - Drill: Atlas Capco DM45/LP - 7 -7/8" <br />-Drill Pad Preparation: NA <br />Misc. Drill Support Equipment: <br />Misc. Explosives Support Equipment: <br />Explosives Delivery —Bulk Truck: <br />-Can Truck: <br />NA <br />NA <br />ANFO Bulk Delivery Truck <br />Cap Delivery Truck <br />Drilling Drill Pad Misc. Drill Misc. Expl. Explosives Delivery <br />Cost Breakdown: Enninment Preparation Sunnort Sunnort Bulk Truck Can Truck <br />QUANTITY <br />UNIT <br />Total Quantity of Stemming Required: <br />49.97 <br />cubic yards <br />Total Quantity of Explosives Required: <br />27,789 <br />pounds <br />Total Quantity of det. cord/fuse /wire Required: <br />11,155 <br />linear feet <br />Quantity of Blasting Caps per Blasthole: <br />1 <br />cap(s) <br />Total Quantity of Blasting Caps Required: <br />254 <br />caps <br />Quantity of Primers per Blasthole: <br />1 <br />rimer(s) <br />Total Quantity of Primers Required: <br />254 <br />primers <br />Quantity of Delays per Blasthole: <br />1 <br />delay(s) <br />Total Quantity of Delays Required: <br />256 <br />delays <br />HOURLY EQUIPMENT COST <br />Shift basis: 1 per day <br />Drilling Equipment - Drill: Atlas Capco DM45/LP - 7 -7/8" <br />-Drill Pad Preparation: NA <br />Misc. Drill Support Equipment: <br />Misc. Explosives Support Equipment: <br />Explosives Delivery —Bulk Truck: <br />-Can Truck: <br />NA <br />NA <br />ANFO Bulk Delivery Truck <br />Cap Delivery Truck <br />Drilling Drill Pad Misc. Drill Misc. Expl. Explosives Delivery <br />Cost Breakdown: Enninment Preparation Sunnort Sunnort Bulk Truck Can Truck <br />Total work team cost/hour: $371.50 <br />MATERIALS COST <br />Drilling <br />Unit <br />Unit Cost <br />Quantity <br />MiscTruck <br />MiscTruck <br />%Utilization - machine: <br />100 <br />NA <br />NA <br />NA <br />10 <br />10 <br />Ownership cost/hour: <br />$69.11 <br />NA <br />NA <br />NA <br />$67.53 <br />$5.42 <br />Operating cost/hour: <br />$135.77 <br />NA <br />NA <br />NA <br />$8.20 <br />$1.87 <br />Ripper op. cost/hour: <br />NA <br />NA <br />NA <br />NA <br />$0.00 <br />$0.00 <br />Operator cost/hour: <br />$44.63 <br />NA <br />NA <br />NA <br />$19.49 <br />$19.49 <br />Unit Subtotals: <br />$249.50 <br />$0.00 <br />$0.00 <br />$0.00 <br />$95.22 <br />$26.78 <br />Number of Units: <br />1 <br />0 <br />0 <br />0 <br />1 <br />1 <br />Group Subtotals: <br />$249.50 <br />$0.00 <br />$0.00 <br />$0.00 <br />$95.22 <br />$26.78 <br />Total work team cost/hour: $371.50 <br />MATERIALS COST <br />Total Materials Cost: $18,968.19 <br />CIRCES Cost Estimating Software <br />Description <br />Unit <br />Unit Cost <br />Quantity <br />Total Cost <br />Bulk ANFO nom. density <br />Blasting Agent: <br />( 7,900 - 15,000 fps) <br />Pound <br />$0.234 <br />27788.934 <br />$6,502.61 <br />Cast primer, 0.3 lb <br />(electric or non - electric <br />Primers or Boosters: <br />system) <br />Each <br />$2.885 <br />254.000 <br />$732.79 <br />Non - electric cap, inst. <br />Blasting Caps: <br />(non - electric systems) <br />Each <br />$3.856 <br />254.000 <br />$979.42 <br />Det. Cord, fuse, or <br />Detonating cord, 10 gr. /ft. <br />wire: <br />(non - electric systems) <br />Linear foot <br />$0.119 <br />11155.320 <br />$1,327.48 <br />MS connectors (non- <br />Delays: <br />electric systems) <br />Each <br />$4.914 <br />256.000 <br />$1,257.98 <br />Stemming, 1.5 in. gravel <br />(inert blasthole packing - <br />Miscellaneous: <br />imported) <br />Cu. yd. <br />$27.190 <br />49.972 <br />$1,358.74 <br />Drill bits: <br />Bit life = 1,750 <br />Linear feet <br />$2,152.00 <br />3.164 <br />$6,809.17 <br />Total Materials Cost: $18,968.19 <br />CIRCES Cost Estimating Software <br />
The URL can be used to link to this page
Your browser does not support the video tag.