My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2012-04-24_APPLICATION CORRESPONDENCE - C2010089
DRMS
>
Day Forward
>
Application Correspondence
>
Coal
>
C2010089
>
2012-04-24_APPLICATION CORRESPONDENCE - C2010089
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 4:56:45 PM
Creation date
4/24/2012 10:46:36 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C2010089
IBM Index Class Name
Application Correspondence
Doc Date
4/24/2012
Doc Name
Reclamation Cost Estimate (Emailed)
From
Jim Stark
To
Marcia Talvitie
Email Name
JRS
MLT
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
142
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Truck Bed (volume) Basis: <br />Struck Volume: <br />60.60 <br />LCY <br />Heaped Volume: <br />78.80 <br />LCY <br />Average Volume: <br />69.70 <br />LCY <br />Adjusted Volume: <br />78.80 <br />LCY <br />Truck Ownership: <br />Final Truck <br />Volume Based on Number of Loader Passes: 67.20 <br />Loading Tool Capacity <br />Operation: <br />Constant operation -0.04 <br />-0.040 <br />(Cat HB) <br />Bucket Size Class: NA <br />Rated Capacity: <br />16.000 <br />(Cat HB) <br />LCY (heaped) <br />Bucket Fill Factor: <br />1.050 <br />Moist loam or sandy clay (100% - 110 %) 1.050 <br />Adjusted Capacity: <br />16.800 <br />LCY <br />Job Condition Corrections: <br />Site Altitude (ft): 5000 feet <br />Net Correction: 0.830 0.830 <br />Loading Tool Cycle Time: Number of Loading Tool Passes Required to Fill <br />Excavators and Front Shovels: <br />Truck <br />Machine Cycle Time vs. Job Condition Rating: NA <br />Selected Value within this Basic Rating: NA <br />Track Loaders — Material Description: <br />Cycle Time Elements (min): <br />Load: NA Maneuver: NA Dump: 0.100 <br />Wheel and Track Loaders - Unadjusted Basic Loader Cycle Time (load, dump, maneuver): 0.625 <br />LCY <br />4 passes <br />minutes <br />Cycle Time Factors <br />Truck <br />Loader <br />Source <br />Altitude Adj: <br />1.000 <br />1.000 <br />(CAT HB) <br />Job Efficiency: <br />0.830 <br />0.830 <br />(CAT HB) <br />Net Correction: 0.830 0.830 <br />Loading Tool Cycle Time: Number of Loading Tool Passes Required to Fill <br />Excavators and Front Shovels: <br />Truck <br />Machine Cycle Time vs. Job Condition Rating: NA <br />Selected Value within this Basic Rating: NA <br />Track Loaders — Material Description: <br />Cycle Time Elements (min): <br />Load: NA Maneuver: NA Dump: 0.100 <br />Wheel and Track Loaders - Unadjusted Basic Loader Cycle Time (load, dump, maneuver): 0.625 <br />LCY <br />4 passes <br />minutes <br />Cycle Time Factors <br />Net Cycle Time Adjustment: -0.100 <br />Factor (min.) <br />Source <br />Material: <br />Material 1/8" to 3/4" diameter -0.02 <br />-0.020 <br />(Cat HB) <br />Stockpile: <br />Conveyor or dozer piled 10 ft. high and up 0.00 <br />0.000 <br />(Cat HB) <br />Truck Ownership: <br />Common ownership of trucks and loaders -0.04 <br />-0.040 <br />(Cat HB) <br />Operation: <br />Constant operation -0.04 <br />-0.040 <br />(Cat HB) <br />Dump Target: <br />Nominal target 0.00 <br />0.000 <br />(Cat HB) <br />CRCES Cost Estimating Software <br />Net Cycle Time Adjustment: -0.100 <br />minutes <br />Adjusted Loader Cycle Time: 0.525 <br />minutes <br />Net Load Time per Truck: 1.675 <br />minutes <br />Truck Cycle Time: <br />Truck Exchange Time: <br />0.80 Minutes Adjusted for site altitude: <br />0.800 Minutes <br />Truck Load Time: <br />1.675 Minutes Adjusted for site altitude: <br />1.675 Minutes <br />Truck Maneuver and Dump Time: <br />1.20 Minutes Adjusted for site altitude: <br />1.200 Minutes <br />CRCES Cost Estimating Software <br />
The URL can be used to link to this page
Your browser does not support the video tag.