Laserfiche WebLink
Task description: <br />Site: New Horizon North Mine <br />BULLDOZER WORK <br />Pond NHN -002 <br />Permit Action: 2012 New Permit <br />Estimate <br />PROJECT IDENTIFICATION <br />Task #: 041 State <br />Date: 02- Mar -12 County <br />User: JRS <br />Colorado <br />Montrose <br />Agency or organization name: DRMS <br />HOURLY EOL <br />Basic Machine: <br />Horsepower: <br />Blade Type: <br />Attachment: <br />Shift Basis: <br />Data Source: <br />Cost Breakdown: <br />IPMENT COST <br />Cat D9T - 9SU <br />405 <br />Semi - Universal <br />3 -shank ripper <br />1 per day <br />(CRG) <br />Permit/Job #: C2010089 <br />Abbreviation: None <br />Filename: C089 -041 <br />Total unit Cost/Hour: $261.15 <br />Total Fleet Cost/Hour: $261.15 <br />MATERIAL OUANTITIES <br />Initial Volume: 13,000 <br />Utilization % <br />Ownership Cost/Hour: <br />$80.19 <br />NA <br />Operating Cost/Hour: <br />$140.68 <br />100 <br />Ripper op. Cost/Hour: <br />$1.79 <br />25 <br />Operator Cost/Hour: <br />$38.49 <br />NA <br />Total unit Cost/Hour: $261.15 <br />Total Fleet Cost/Hour: $261.15 <br />MATERIAL OUANTITIES <br />Initial Volume: 13,000 <br />Swell factor: 1.125 <br />Loose volume: 14,625 LCY <br />Source of estimated volume: <br />Pond NHN -002 Plan and Profile; Figure 3 <br />Source of estimated swell <br />Cat Handbook <br />factor: <br />HOURLY PRODUCTION <br />Average push distance: <br />75 feet <br />Unadjusted hourly <br />1,514.3 LCY/hr <br />production: <br />Materials consistency description: Compacted fill or embankment 0.9 <br />Average push gradient: 0 % <br />Average site altitude: 5,000 feet <br />Material weight: 2,650 lbs/LCY <br />Weight description: Decomposed rock - 25% Rock, 75% Earth <br />CIRCES Cost Estimating Software <br />