Laserfiche WebLink
Task description: <br />Site: New Horizon North Mine <br />BULLDOZER WORK <br />Pond NHN -001 <br />Permit Action: 2012 New Permit <br />Estimate <br />PROJECT IDENTIFICATION <br />Task #: 040 State <br />Date: 02- Mar -12 County <br />User: JRS <br />Colorado <br />Montrose <br />Agency or organization name: DRMS <br />Permit/Job #: C2010089 <br />Abbreviation: None <br />Filename: C089 -040 <br />HOURLY EQUIPMENT COST <br />Basic Machine: Cat D9T - 9SU <br />Horsepower: 405 <br />Blade Type: Semi- Universal <br />Attachment: 3 -shank ripper <br />Shift Basis: 1 per day <br />Data Source: (CRG) <br />Cost Breakdown: <br />Utilization % <br />Ownership Cost/Hour: <br />$80.19 <br />NA <br />Operating Cost/Hour: <br />$140.68 <br />100 <br />Ripper op. Cost/Hour: <br />$1.79 <br />25 <br />Operator Cost/Hour: <br />$38.49 <br />NA <br />Total unit Cost/Hour: $261.15 <br />Total Fleet Cost/Hour: $261.15 <br />MATERIAL QUANTITIES <br />Initial Volume: 15,600 <br />Swell factor: 1.125 <br />Loose volume: 17,550 LCY <br />Source of estimated volume: Pond NHN -001 Plan and Profile; Figure 2 <br />Source of estimated swell Cat Handbook <br />factor: <br />HOURLY PRODUCTION <br />Average push distance: <br />Unadjusted hourly <br />production: <br />75 feet <br />1,514.3 LCY/hr <br />Materials consistency description: Compacted fill or embankment 0.9 <br />Average push gradient: 0 % <br />Average site altitude: 5,000 feet <br />Material weight: 2,650 lbs/LCY <br />Weight description: Decomposed rock - 25% Rock, 75% Earth <br />CIRCES Cost Estimating Software <br />