Laserfiche WebLink
COST SUMMARY WORK <br />Task description: New Horizon North New Permit Cost Summai <br />Permit Action: 2012 New Permit <br />Site: New Horizon North Mine Estimate <br />PROJECT IDENTIFICATION <br />Task #: 000 State: Colorado <br />Date: 3/6/2012 County: Montrose <br />User: JRS <br />Agency or organization name: DRMS <br />TASK LIST (DIRECT COSTS) <br />Permit/Job #: C2010089 <br />Abbreviation: None <br />Filename: C089 -000 <br />Task <br />Descri tion <br />Form <br />Used <br />Fleet <br />Size <br />Task <br />Hours <br />Cost <br />001 <br />002 <br />003 <br />004 <br />005 <br />010 <br />011 <br />012 <br />013 <br />014 <br />015 <br />020 <br />021 <br />022 <br />023 <br />030 <br />031 <br />032 <br />040 <br />041 <br />042 <br />043 <br />044 <br />045 <br />046 <br />047 <br />048 <br />049 <br />055 <br />056 <br />057 <br />058 <br />059 <br />060 <br />061 <br />062 <br />Drill and Shoot Highwall <br />BLASTING <br />1 <br />1 <br />2 <br />2 <br />2 <br />2 <br />2 <br />2 <br />2 <br />2 <br />2 <br />2 <br />2 <br />2 <br />2 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />2 <br />1 <br />1 <br />147.81 <br />$49,852.32 <br />$1,620,220.48 <br />$1,123,707.66 <br />$8,666.38 <br />$5,103.14 <br />$5,493.00 <br />$3,607.00 <br />$5,467.00 <br />$1,674.00 <br />$3,839.00 <br />$130,473.00 <br />$14,496.03 <br />$21,991.13 <br />$6,712.65 <br />$26,974.14 <br />$5,852.00 <br />$657.00 <br />$1,125.00 <br />$7,780.38 <br />$6,483.65 <br />$6,683.15 <br />$980.51 <br />$169.98 <br />$382.90 <br />$71.57 <br />$465.21 <br />$758.65 <br />$145,440.00 <br />$25,802.76 <br />$35,334.50 <br />$35,334.50 <br />$50,659.61 <br />$8,189.44 <br />$1,819.87 <br />$15,142.15 <br />$6,351.14 <br />Backftll Final Pit with Overburden Stockpile <br />TRUCKl <br />795.18 <br />Regrade Trailing Spoil Ridges <br />DOZER <br />1,264.64 <br />Regrade Facilities Area <br />DOZER <br />9.75 <br />Regrade Overburden Stockpile Area <br />DOZER <br />5.74 <br />Rip Facilities Area <br />RIPPER <br />5.76 <br />Rip West Haul Road <br />RIPPER <br />3.78 <br />Rip East Haul Road <br />RIPPER <br />5.73 <br />Rip Northwest Haul Road <br />RIPPER <br />1.75 <br />Rip Equipment Corridor Road <br />RIPPER <br />4.02 <br />Rip All Topsoil Replacement Areas Prior to <br />Reseeding <br />RIPPER <br />136.96 <br />Regrade West Haul Road <br />DOZER <br />16.31 <br />Regrade East Haul Road <br />DOZER <br />24.75 <br />Regrade Northwest Haul Road <br />DOZER <br />7.55 <br />Regrade Equipment Corridor Road <br />DOZER <br />30.36 <br />Finish Grade Pit Areas <br />GRADER <br />44.71 <br />Finish Grade Facilities Area <br />GRADER <br />5.02 <br />Finish Grade Overburden Stockpile Area <br />GRADER <br />8.59 <br />Regrade Pond NHN -001 <br />DOZER <br />29.79 <br />Regrade Pond NHN -002 <br />DOZER <br />24.83 <br />Regrade Pond NHN -003 <br />DOZER <br />25.59 <br />Regrade Ditch NHN -001 East <br />DOZER <br />3.75 <br />Regrade Ditch NHN -001 West <br />DOZER <br />0.65 <br />Regrade Ditch NHN -002 North <br />DOZER <br />1.47 <br />Regrade Ditch NHN -002 South <br />DOZER <br />0.27 <br />Regrade Ditch NHN -003 North <br />DOZER <br />1.78 <br />Regrade Ditch NHN -003 South <br />DOZER <br />2.91 <br />Reconstruct Second Park Lateral Irrigation Ditch <br />NA <br />105.88 <br />Replace Topsoil from Stockpile to 2013 Pit Area <br />TRUCKl <br />14.97 <br />Replace Topsoil from Stockpile to 2014 Pit Area <br />TRUCKl <br />17.34 <br />Replace Topsoil from Stockpile to 2015 Pit Area <br />TRUCKl <br />17.34 <br />Replace Topsoil from Stockpile to 2016 Pit Area <br />TRUCKl <br />24.86 <br />Replace Topsoil from Stockpile to Facilities Area <br />TRUCKl <br />4.75 <br />Replace Topsoil from Stockpile to Topsoil <br />Stockpile Area <br />DOZER <br />2.05 <br />Replace Topsoil from Stockpile Overburden <br />Stockpile Are <br />TRUCKl <br />8.78 <br />Replace Topsoil from Stockpile to West Haul Road <br />I TRUCKl <br />3.12 <br />CIRCES Cost Estimating Software <br />