Laserfiche WebLink
JD -8 Mine — Drainage Design Plan ii <br />Table 13. Preliminary Dimensions for the Operational and Post - Mining Stormwater Retention Pond 13 <br />Table 14. Operational and Post - Mining Drainage —Peak Discharge (qioo) 14 <br />Table 15. Operational and Post - Mining Drainage Structure Parameters 14 <br />LIST OF FIGURES <br />Figure 1. Stormwater Drainage Areas at the JD -8 Mine 3 <br />Figure 2. Upland Non - Contributing Drainage Areas 4 <br />Figure 3. Post - Mining Stormwater Routing Plan 12 <br />LIST OF PHOTOS <br />Photo 1. Photo of Berm and Cutoff Ditch on Access Road Southeast of JD -8 Mine Site <br />Photo 2. Eastern Portion of Waste Rock Pile Showing Constructed Catchment and Perimeter Berms for <br />Drainage Control <br />Photo 3. Western Portion of Waste Rock Pile Showing Former Rivulet and Small Gully that was Mitigated <br />by Repairing the Crest Berm <br />Attachment 1 <br />Attachment 2 <br />Attachment 3 <br />LIST OF ATTACHMENTS <br />Culvert Hydraulic Profiles <br />Rip Rap Granular Bedding Specifications (from UDFCD 2011) <br />Typical Spillway Design Schematic (from FWHA 2009) <br />4122A.120325 Whetstone Associates <br />