Laserfiche WebLink
Response to DRMS Adequacy Review — Cotter JD -8 Mine Reclamation Plan Amendment <br />Attachment 4 <br />Revised Drainage Design Plan <br />for the JD -8 Mine EPP (Attachment A to Stormwater Management Plan) <br />JD -8 Mine Permit Amendment <br />Response to Adequacy Review <br />M- 1984 -014 <br />This attachment provides the Revised Drainage Design Plan for the JD -8 Mine EPP <br />(Attachment A to Stormwater Management Plan). <br />Page A -24 <br />