My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2012-04-20_PERMIT FILE - P2012006
DRMS
>
Day Forward
>
Permit File
>
Prospect
>
P2012006
>
2012-04-20_PERMIT FILE - P2012006
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 4:56:31 PM
Creation date
4/23/2012 3:36:59 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
P2012006
IBM Index Class Name
PERMIT FILE
Doc Date
4/20/2012
Doc Name
NOI APPLICATION
From
GOLD HILL MINERALS
To
DRMS
Email Name
MAC
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
40
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
4 (FORM 2 - Public filing) <br />11. Describe proposed surface excavation or other land disturbance, including roads, pits, trenches, waste piles, drill pads and <br />collar areas of underground workings, ponds, etc... <br />Please see attached document Section 3.1.3 <br />12. Proposed Disturbance (approximate) Describe the proposed drilling to be conducted, including anticipated number of holes, <br />diameter, depth, location, etc... Submit additional pages if necessary: <br />A. Drill Pads: Quantity 11.00 Average Width 40.00 (ft) Average Length 40.0 (ft) <br />B. Drill Holes: Quantity 50.00 Depth 1,000.00 (ft) Diameter 5.25 (in) <br />C. Mud Pits: Quantity 22.00 Average Width 8 (ft) Average Length 15.00 (ft) <br />Average Depth 4.0 (ft) <br />Described proposed underground work, including reopening of old workings, advancement of adits or shafts, <br />trenches, pits, cuts, rock dumps, or other types of disturbance, describe type, quantity and general dimensions: <br />Workings access will be made through the 350 level portal. An area at the entrance <br />measuring 100 ft. by 100 ft. will be needed as temporary storage for materials and <br />equipment used for workings access. No surface waste rock or dumps are planned. <br />Pl ease see the atlauiled ducurrienl, Secliun 3.1.3. <br />F. Other Disturbances (please describe): <br />No new disturbance is planned. All most all surface activity will occur on existing access <br />roads. No improvements to roads are planned, only simple maintenance and the <br />installation of water bars where needed to control storm water runoff. <br />G. Indicate Chemicals and Fuels used or stored on site. List type, quantity and method to store. <br />The typical chemicals needed for an exploration drill operation and drill hole closeout. The only fuel will be <br />what is contained in the vehicle or generator fuel tanks and several five gallon fuels cans of gasoline and /or <br />the drill core holes. Sacked drilling muds may also be present . Materials will be stored on pallets on the drill <br />pad site, covered with a tarp or plastic. <br />F. New Road(s): Length (ft) Width (ft) <br />Significantly Upgraded Road(s) Length (ft) Width (ft) <br />Are culverts or other crossings proposed? If so, please describe: <br />roads will be maintained for access and have water bars installed as needed to control <br />storm water runoff. No new roads. <br />
The URL can be used to link to this page
Your browser does not support the video tag.