Laserfiche WebLink
6 (FORM 2 - Public filing) <br />8. Describe the estimated topsoil depth and how topsoil will be salvaged, stockpiled and redistributed for the re- establishment of <br />vegetation. Specify approximate topsoil redistribution depth: <br />Please see the attached document Section 3.1.9 The soils in this area are thin mountain <br />soils. Where a drill pad is constructed off an existing road, the plant growth material, to a <br />aeptn OT six incnes, wm be pusnea upnll from a proposea anti paa site. <br />9. Describe how drill holes will be plugged (refer to Rule 5.4 of the Rules for required abandonment procedures): <br />Please see the attached document Section 3.1.5(6) <br />10. Describe how portals, adits, shafts, ponds, excavations, or other disturbances will be reclaimed (refer to Rule 3 and Rule 5 for <br />specific reclamation performance standards). You may wish to contact the Division for closure specifications. <br />Please see the attached document Section 3.1.5(4). Any closures installed by the <br />Division's Inactive Mined Land Program (DRMS IMP) and removed or altered by Gold Hill <br />Minerals (GHM) exploration activity will be repaired or replaced according to the DBMS <br />-- ■- <br />remove an existing DRMS IMP closure prior to disturbance_ We will work with the Division <br />at that time as to an acceptable design and appropriate bonding. <br />11. Describe how roads will be reclaimed or returned to their pre - prospecting (or better) condition: <br />All roads are existing roads. Please see the attached document Section 3.1.9(5). <br />