Laserfiche WebLink
76 <br /> TAB 9 <br /> TABLE 9-4 <br /> Anticipated Topsoil Handling Schedule <br /> Nucla Mine, Montrose County, Colorado <br /> Topsoil Topsoil Stockpile Inventory Take & Total <br /> Supply Demand Acre/Feet put Handled <br /> Year Ac.-Ft. Ac.-Ft. In Balance Out Ac.-Ft. ' Ac-Ft. <br /> July <br /> 1978- 20.39 -0- 20.39 20.39 -0- -0- 20.39 <br /> 1979 <br /> 1980 28.15 25.79 2.36 22.75 -0- 25.79 28.15 <br /> 1981 21.02 31.35 -0- 12.42 10.33 21.02 31.35 <br /> 1982 21.71 16.62 5.09 17.51 -0- 16.62 21.71 <br /> 1983 19.24 16.62 2.62 20.13 -0- 16.62 19.24 <br /> 1984 16.76 16.72 0.04 20.17 -0- 16.71 16.76 <br /> 1985 -0- 12.59 -0- 7.58 12.59 -0- 12.59 <br /> 1986 -0- 7.58 -0- -0- 7.58 -0- 7.58 <br /> TOTAL 127.27 127.27 30.50 --- 30.50 96.76 157.77 <br /> 1Calculation of percent take and put: 96.76 Ac.-Ft. (take-and-put) . 127.27 Ac.-Ft. <br /> (topsoil supply) x 100 = 76.030 of total topsoil salvaged. <br />