Laserfiche WebLink
The Topsoil Management Plan for Nucla East, including the proposed <br /> topsoil balance, is presented in Tab 21, Minesoil Reconstruction. <br /> Proposed topsoil stockpile designations and locations are shown on <br /> Exhibit 12-3, Operations Plan - Nucla East and Exhibit 21-3, Topsoil <br /> Salvage and Replacement Area. <br /> vi Revised 04/11/88 <br />