Laserfiche WebLink
INTRODUCTION <br /> Peabody Coal Company will disturb approximately 134 acres of native <br /> soils, topsoiled reclamation areas, and regraded spoils during 1988 at <br /> Nucla Mine. Mine-related disturbance will occur in three separate areas <br /> as shown on Exhibit 12-2, Operations Plan. Peabody Coal Company will <br /> affect about 125.2 acres of pastureland, hayland, rangeland, and <br /> associated disturbed land (farmyards, ponds, roads, and residence-5f` <br /> '9q <br /> during the next two years (1989-1990) within th '234.5 acre Nlbcla East <br /> permit area as shown on Exhibit 12-3, Operations Plan -NucTa East. <br /> Peabody Coal Company, in conjunction with the USDA, Soil Conservation <br /> Service, Norwood, Colorado, conducted a reconnaissance of Nucla Mine <br /> surface soils in 1975. This soils map, originally completed on 1" = <br /> 400' aerial photos dated July 22, 1975, was submitted as part of Surface <br /> Mine Permit (SMP) 75-36 (see Exhibit C-5, Soils Map, 7-22-75) . This <br /> initial Order 3 soil survey included the entire Nucla Mine Control Area <br /> (Portions of Sections 25, 26, 35, and 36 in T47N, R16W and Sections 30 <br /> and 31 in T47N, R15W) . <br /> An Order 1-2 soil survey was completed by Claude L. Fly and Associates <br /> in May, 1979 for the 116-acre mining tract located predominantly in the <br /> SW 1/4 of Section 25, T47N, R16W. This soil survey information, <br /> submitted as Tab 9 of SMP C-008-81, included all of Mining Area 1 (see <br /> Exhibit 12-2, Operations Plan, and Exhibit 9-1, Soil Types) . <br /> Two additional Order 1-2 soil surveys were completed for Nucla Mine in <br /> 1979 and 1980. First, the East Pit soil survey addition, completed by <br /> Peabody Coal Company in November, 1979, is located 0.5 miles southeast <br /> of the Nucla Mine office in the SW 1/4 NW 1/4 and the NW 1/4 SW 1/4 of <br /> Section 31, T47N, R15W. This survey information, presented as <br /> Attachment 9-2A to Tab 9, SMP C-008-81, included a portion of Mining <br /> Area 3 (see Exhibit 12-2, Operations Plan, and Exhibit 9-1, Soil Types) . <br /> Second, the Shop Area soil survey addition, completed by Peabody Coal <br /> Company in November, 1980, is located in the immediate vicinity of the <br /> Nucla Mine office within the E 1/2 SW 1/4 SE 1/4, Section 25 and W 1/2 <br /> SE 1/4 SE 1/4 of Section 25, T47N, R16W. This survey information, <br /> iv Revised 04/11/88 <br />