My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2012-03-22_PERMIT FILE - C1991078A
DRMS
>
Day Forward
>
Permit File
>
Coal
>
C1991078A
>
2012-03-22_PERMIT FILE - C1991078A
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 4:55:25 PM
Creation date
4/23/2012 9:03:51 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1991078A
IBM Index Class Name
Permit File
Doc Date
3/22/2012
Section_Exhibit Name
2.03 Legal, Financial, Compliance & Related Info
Media Type
D
Archive
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
13
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
2.03.6(1) <br />The Bray coal lease was terminated on a pro-rata basis <br />during April 1997. The termination applies to the <br />unaffected acreage under the lease. The lease contains <br />approximately 11.6 disturbed acres under the mining <br />permit. In describable sections, the lands for which the <br />Bray Coal Mining Lease pertain as of April 1997 are: <br />Section 33: Disturbed areas in the SW'sNW;NE'~, SE$NE$, <br />W~NW;SE; <br />2.03.6(2) <br />(2) (a) <br />The private mineral estate to be mined in the E/2 <br />of Section 33 has been severed from the private <br />surface estate. The surface owner, Bray, has <br />supplied written consent to the extraction of coal <br />by surface mining methods by the Bray coal mining <br />lease referenced above. No additional mining is <br />anticipated. <br />• <br />Within the permit area <br />surface is owned by Roy <br />coal is owned by the BLM <br />plan to mine the Federal <br />in Sections 5 & 32, the <br />and Betsy Davis and the <br />The applicant does not <br />coal. <br />2.03.7 RELATIONSHIP TO AREAS DESIGNATED UNSUITABLE FOR MINING <br />(1) The project area does not encompass any fragile or <br />historic lands nor are there any natural hazards present <br />which would preclude mining. The proposed permit area <br />was not part of the Resource Management Plan prepared by <br />the BLM for the region. Unsuitability criteria does not <br />apply to private coal. All of the coal to be mined is <br />private coal. <br />2.03.8 PERMIT TERM INFORMATION <br />(1) Mining activity commenced on the property in March 1992 <br />and ceased in July 1993. Approximately 111 acres of land <br />were disturbed during active mining. Additional details <br />about the schedule of the disturbance are presented in <br />Section 2.05.3(2). <br />(2) Not applicable <br />(3) The term of the permit shall be for five years. <br />• <br />2.03-9 August 1999 <br />
The URL can be used to link to this page
Your browser does not support the video tag.