Laserfiche WebLink
1.000 <br />(AVG.) <br />0.830 <br />(1 SHIFT /DAY) <br />1.000 <br />(DOZ -OC) <br />0.786 <br />(CAT HB) <br />1.000 <br />(CAT HB) <br />0.793 <br />(CAT HB) <br />1.000 <br />(PAT) <br />Bulldozer Worksheet Cont'd <br />Visibility: <br />Job efficiency: <br />Spoil pile: <br />Push gradient: <br />Altitude: <br />Material Weight: <br />Blade type: <br />Net correction: 0.3492 <br />Adjusted unit production: 181.20 LCY /hr <br />Adjusted fleet production: 181.2 LCY /hr <br />JOB TIME AND COST <br />Fleet size: <br />Unit cost: <br />Total job time: <br />Total job cost: <br />1 Dozer(s) <br />$0.871 /LCY <br />334.52 Hours <br />$52,766.53 <br />Task # X02 <br />Page 2 of 2 <br />CIRCES Cost Estimating Software <br />