Laserfiche WebLink
Colorado Division ®f Minerals and Geology <br />Annual Reclamation Report for the Year 2011 <br />f' �_t LC <br />mine name permit # Permittee <br />Address: 17 ,Dl�, 2n s <br />, t �1 A , �i�ot1't 4� ��. ) [ � Qi <br />This report, required by Rule 2.04.13, is due by February 15 of each year, or other date, as agreed upon <br />by the Division. It should include text, discussion, and maps, at a minimum, in addition to any other <br />reclamation monitoring data as required by the approved permit. The location of the acreage reported <br />under each land status category and year of seeding (if applicable) should be clearly and accurately <br />identified on a map included with the report. <br />Land Status Category <br />Mast Years <br />Cumulative Total <br />This <br />This Calendar <br />Year <br />Cumulative Total <br />Acres disturbed <br />J� <br />+ <br />Cumulative <br />Calendar <br />I <br />Cumulative <br />I <br />Acres backfilled and graded <br />", 7Z <br />+ <br />than 10 <br />= <br />Z <br />Acres topso <br />�J� 2 7 <br />+ <br />less <br />_ <br />ears' <br />Seeding typically begins the minimum 10 -year reclamation liability period. Please report the acres for <br />each category below. Do not include acres that have achieved final, Phase III release. <br />*Include, if necessary, a description of any augmented seeding or cultural practices <br />For the Entire Life of Mine, the total fiurriber of acres disturbed and the total number of acres; <br />Phase I released /Z / Phase II release Phase III released 0 <br />For Mines in Permanent Cessation: <br />Total acreage in facilities subject to reclamation but yet to be completed !� <br />For Government Performance and Results Act <br />Acreage in long -term mining or reclamation facilities 2 G� <br />Acreage in active mining areas s <br />(exclude acres where Phase III release has been achieved) <br />2 Includes haul and access roads; temporary dams and impoundments; permanent dams and impoundments; diversion and <br />collector ditches, water and air monitoring sites; topsoil stockpiles; overburden stockpiles; repair, storage and construction areas; <br />office area, repair shops, and parking; coal stockpiles, loading, and processing areas; railroads; coal conveyors; nonbackfilled and <br />graded areas of refuse piles, coal mine waste impoundments, head -of- hollow fills, and valley fills; ventilation shafts and entryways; <br />and noncoat waste disposal area (garbage dumps and coal combustion by- products disposal areas). <br />3 Includes pits, topsoil stripped areas in advance of pits, and spoil not back#i #led and graded <br />Last Years <br />This <br />Greater <br />Cumulative <br />Calendar <br />I <br />Cumulative <br />I <br />10 years or <br />than 10 <br />Total <br />year <br />Total' <br />less <br />ears' <br />Acres seeded* <br />61 V <br />+ 15 -1 <br />-. _ 6 <br />_ <br />&0 <br />+ <br />*Include, if necessary, a description of any augmented seeding or cultural practices <br />For the Entire Life of Mine, the total fiurriber of acres disturbed and the total number of acres; <br />Phase I released /Z / Phase II release Phase III released 0 <br />For Mines in Permanent Cessation: <br />Total acreage in facilities subject to reclamation but yet to be completed !� <br />For Government Performance and Results Act <br />Acreage in long -term mining or reclamation facilities 2 G� <br />Acreage in active mining areas s <br />(exclude acres where Phase III release has been achieved) <br />2 Includes haul and access roads; temporary dams and impoundments; permanent dams and impoundments; diversion and <br />collector ditches, water and air monitoring sites; topsoil stockpiles; overburden stockpiles; repair, storage and construction areas; <br />office area, repair shops, and parking; coal stockpiles, loading, and processing areas; railroads; coal conveyors; nonbackfilled and <br />graded areas of refuse piles, coal mine waste impoundments, head -of- hollow fills, and valley fills; ventilation shafts and entryways; <br />and noncoat waste disposal area (garbage dumps and coal combustion by- products disposal areas). <br />3 Includes pits, topsoil stripped areas in advance of pits, and spoil not back#i #led and graded <br />