Laserfiche WebLink
Task R: M1 <br />Mine: Hansen Uranium Project <br />Permit no.: P -2009 -025 <br />Permitting action: MO -01 <br />BOREHOLE SEALING WORK <br />Date: 4/18/12 <br />Prepared by: TAK <br />Cwt of bulk cement Water <br />2,500 gal Octoplug Cut surface Total cost <br />(assuming 94 lbs of Total rig Rig w/ crew truck w/ <br />Hole Hole Cement cost water truck (Circes, casing & before bond <br />Total cement per 1.18 cf of Cement Rig setup time Rig time to time hourly rate Total rig driver cost <br />Hole diem. volume per cwt w /driver $19.57 mark % Liab. release or Total cost <br />depth (ft) hole, that is 100 lbs total cost per hole (hr) fill hole (setup + (Circes, Reed cost (rig fill <br />(in) (cf) (CIRCES) hourly rate per in. (Circes, increment <br />of cement fills 1.25 811) drill, 9.0 ") time x <br />(Circes) diem.) $10.90/10 obligation <br />cf) truck rate) <br />9 holes, additional 18 inches diameter, over 30 -ft interval <br />6' diam., previously bonded 6 270 53 <br />24" diam., not bonded 24 270 848 <br />42 $10.90 $462 0.53 0.53 $133.59 $71 $63.70 $34 100% $567 $567 <br />678 $10.90 $7,395 8.48 8.48 $133.59 $1,133 $63.70 $540 100% $9,068 $9,068 <br />Task 496 - Page 1 of 1 <br />M� <br />9.01 rig hours Grand Total (24" diam., minus 6" diam) $8,502 <br />/ 1 rigs <br />4.51 project hours <br />