My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1986-12-31_REPORT - C1981008 (7)
>
Day Forward
>
Report
>
Coal
>
C1981008
>
1986-12-31_REPORT - C1981008 (7)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/30/2020 2:18:05 PM
Creation date
4/19/2012 3:13:39 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981008
IBM Index Class Name
Report
Doc Date
12/31/1986
Doc Name
1986 Annual Hydrology Report Appendix D (Part 5 of 8)
Annual Report Year
1986
Permit Index Doc Type
Hydrology Report
Media Type
D
Archive
No
Tags
DRMS Re-OCR
Description:
Signifies Re-OCR Process Performed
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
29
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
MONITOR WELL DRILLING AND CONSTRUCTION SUMMARY <br /> 1 NUCLA AND NUCLA EAST MINES <br /> Monitor Well Name GW-N15 (WN0015) Geologic Unit Monitored Dakota Coal Overburde <br /> Elevation Ground Level (ft-amsl ) 5712.55 <br /> Location: N 601939. 195 E 1 , 116089.86 T47 N R 16 W S36 D A C <br /> Total Drill Depth (ft) 79.3 <br /> Total Well Depth (ft) 79.8 <br /> Drilling Details <br /> Borehole Diameter (in) 6 3/4 Rig Speedstar 1500 <br /> Bits Tricone Driller Allan Chiles <br /> Drilling Fluid Air and Mud <br /> Additional Details <br /> Drilling/Construction: Start 06/16/86 Finish 06/17/86 <br /> Lithologic Log (Y/N) N <br /> Geophysical Log (Y/N) N <br /> Construction Details <br /> Casing Specs : Blank 4" id PVC sch 40 Perforated 0.02" slot <br /> Perforated Intervals) 15.3 - 79.8 <br /> Packer and Cement Basket Set At NA <br /> Cement From 5.0' To Ground Surface <br /> Bentonite Slurry From NA To <br /> Gravel Pack From 5.0' To 79.8 <br /> Additional Details Gravel pack generally less than 3/8" in diameter but <br /> some as large as 1 "; also contained some dried twigs. <br /> Development Summary_ Developed for 15 min. on 06/16/86; developed further on <br /> 06/17/86 for 3 112 hours ultimately producing 1 gpm with @ 1 tsp silt per min. <br /> Comments , Problems <br /> D-6 Revised 11/01/86 <br />
The URL can be used to link to this page
Your browser does not support the video tag.