My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1986-12-31_REPORT - C1981008 (3)
DRMS
>
Day Forward
>
Report
>
Coal
>
C1981008
>
1986-12-31_REPORT - C1981008 (3)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/30/2020 2:21:11 PM
Creation date
4/19/2012 3:12:44 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981008
IBM Index Class Name
Report
Doc Date
12/31/1986
Doc Name
1986 Annual Hydrology Report (Part 1 of 8)
Annual Report Year
1986
Permit Index Doc Type
Hydrology Report
Media Type
D
Archive
No
Tags
DRMS Re-OCR
Description:
Signifies Re-OCR Process Performed
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
120
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
embankment slopes. The principal spillway outlet has been a <br /> sharp-crested 90' V-notch weir. The redesign of the principal <br /> spillway will utilize a drop inlet spillway with a 6-inch barrel <br /> diameter and a 12-inch riser diameter. In order to continue <br /> monitoring flow continuously out of the pond as required by the <br /> approved monitoring program (Appendix A) , an appropriately sized <br /> H-flume with a continuous recorder will be installed immediately <br /> below the principal spillway outlet as soon as possible, weather <br /> permitting, after the pond reconstruction work has been completed, <br /> which has been projected to be in the early spring of 1987. <br /> 4. Site SW-N2 <br /> Site SW-N2 is located below mining on the lower reach of the <br /> West Return Ditch immediately above its confluence with Tuttle <br /> Drawn as shown on Exhibit 1. This site was monitored for flow and <br /> quality three times in 1980; the monitoring data are presented in <br /> Appendix B. Monitoring at this site was abandoned in the fall of <br /> 1980 because upstream monitoring at NPDES 001 and downstream <br /> monitoring at SW-N3 precluded the need for this site. Consequently <br /> the data presented are extremely limited and no further discussion <br /> is hereby provided. <br /> 5. Springs <br /> As shown on Exhibit 1, three springs, the Highwall Spring and <br /> Spoils Springs #1 and #2 are monitored at the Nucla Nine. As <br /> earlier discussed, a semiannual spoils spring survey of reclaimed <br /> areas has been implemented as of this September (1986) . In the <br /> course of this survey, the PCC field hydrologist responsible for <br /> the Nucla Mine discovered a second spoil spring proximate to Spoils <br /> Spring #1. This spring, identified as Spoils Spring #2, will be <br /> monitored according to the same program that Spoils Spring #1 is <br /> monitored (see Section III. A. ) . <br /> The Highwall Spring is located on the north face of the east <br /> end of the mining pit which was left when PCC ceased mining in <br /> the fall of 1983 as shown on Exhibit 1. Flow and quality data <br /> have routinely been collected from this site since June of 1983; <br /> 58 <br />
The URL can be used to link to this page
Your browser does not support the video tag.