Laserfiche WebLink
Information included stream alpha lists, water <br /> decrees, well permits and surface-water diversion <br /> records; <br /> c. field verification of the existence and condition <br /> of key components of the Highline Canal and its <br /> laterals, headgates, turnouts, and split boxes. The <br /> locations of potentially impacted water rights were <br /> also verified in the field; <br /> d. review of the water requirements during and after <br /> mining; <br /> e. assessment of the potential impact to water rights <br /> which may result from mining and reclamation <br /> operations; and <br /> f. development of an augmentation plan to mitigate <br /> potential impacts to water rights, and a monitoring <br /> plan to indicate changes in the surface-water flow <br /> and water levels adjacent to the NUCLA EAST pit. <br /> This report presents the results of GEOTRANS' study. <br /> Peabody's owned, leased and optioned land and water <br /> resources are presented in Chapter 2 .0. The operational and <br /> 3 <br /> GEOTRANS, INC. <br />