Laserfiche WebLink
TABLE 2 <br /> Proposed Surface Water Monitoring Program for <br /> Nucla During Temporary Cessation <br /> Cessation <br /> Monitoring Frequency <br /> Site Name Location Drainage Flow Quality <br /> SW-N1 Nucla Upper Tuttle Draw Semiannual Semiannual* <br /> SW-N2 Nucla Lower West -- -- <br /> Return Ditch <br /> SW-N3 Nucla Lower Tuttle Draw Semiannual Semiannual* <br /> SW-N4 Nucla Lower East -- -- <br /> Return Ditch <br /> SW-N5 (NPDES 001 ) Nucla Mid-Lower See Below** <br /> West Return Ditch <br /> SW-N6 Nucla Mid-West -- -- <br /> Return Ditch <br /> SW-N7 Nucla Upper West Semiannual Semiannual* <br /> Return Ditch <br /> SW-N8 Nucla Lower Second Park -- -- <br /> Irrigation Ditch <br /> SW-N9 Nucla Lower Second Park -- -- <br /> NPDES 002 Nucla Tributary to See Below** <br /> Tuttle Draw <br /> NPDES 003 Nucla Tributary to See Below** <br /> Tuttle Draw <br /> NPDES 004 Nucla Tributary to See Below** <br /> Tuttle Draw <br /> NPDES 005 Nucla Tributary to See Below** <br /> Tuttle Draw <br /> NPDES 006 Nucla Mid-West See Below** <br /> Return Ditch <br /> *Field parameters (pH, temp., conductivity, and flow) and full suite water quality will be measured <br /> semiannually in April and September. <br /> **Monitoring is done in compliance and in accordance with Colorado NPDES Permit No. CO-0000213 <br /> for Nucla Mine. In addition, full suite water quality will be measured semiannually in April and <br /> September at NPDES 001 (SW-N5). <br /> 15-4-5 Revised 02/22/90 <br />