Laserfiche WebLink
Nucla East Baseline Surface Water Monitoring Program <br /> Monitoring Frequency Monitoring Equipment <br /> Site Name Location Drainage Flow Quality Instrumentation Remarks <br /> SW-N101 Upper Calamity Draw Monthly Monthly None This site is a natural reach of <br /> Calamity Draw <br /> SW-Nl02 Triburary to Monthly Monthly* 15-inch CMP This site is a 15-inch culvert under <br /> Calamity Draw the road. Volumetric weir or bucket <br /> and stop watch <br /> SW-Nl03 Lower Calamity Draw Monthly Monthly* None This site is a natural reach of <br /> Calamity Draw <br /> n SW-N104 Upper West Monthly Monthly* Stilling well equipped The stilling well and recorder was <br /> Lateral Ditch with a Stevens digital installed on April 30, 1987 after that <br /> (San Miguel River) water level recorder date water level stage heights are <br /> measured on 60-minute intervals <br /> SW-N105 Mid-West Lateral Monthly Monthly* Staff gage This site is at an existing wooden <br /> Ditch (San Miguel flume box <br /> River) <br /> SW-Nl06 Lower West Monthly Monthly* Stilling well equipped The stilling well and recorder was <br /> Lateral Ditch with a Stevens digital installed on April 30, 1987 after that <br /> (San Miguel water level recorder date water level stage heights were <br /> River) measured on 60-minute intervals <br /> SW-Nl07 Mid-Lower Monthly None Crest Stage Gage This site is checked monthly to determine <br /> CD <br /> :5. Calamity Draw what peak flow was for the period. Peak <br /> m flow is determined using Manning equation <br /> n <br /> 0 <br /> r <br /> CO <br />