Laserfiche WebLink
TABLE OF CONTENTS <br /> Page <br /> Introduction 1 <br /> Site Description 1 <br /> Land Use 1 <br /> Embankment 1 <br /> Design Analysis 1 <br /> General 1 <br /> Hydrology 2 <br /> SCS Curve Numbers and "k" Factor 3 <br /> Precipitation and Storm Type 7 <br /> Unit Hydrograph and Surface Condition 7 <br /> Time of Concentration 7 <br /> Sedimentology 8 <br /> Particle Size Distributions 8 <br /> Length - Slope Factors (L,S) 8 <br /> Control Practice Factor (CP) 9 <br /> Sediment Storage Capacity 9 <br /> Pond Storage Capacity 9 <br /> Spillway 10 <br /> Pond No. 007 - East Ditch 12 <br /> Construction Plan 14 <br /> Site Work Prior to Embankment Construction 14 <br /> Embankment Design and Construction 14 <br /> Selected References 15 <br /> Addendum A - 10-year, 24-hour SEDIMOT II (Input and Output) - 007 Pond <br /> Addendum B - 25-year, 24-hour SEDIMOT 11 (Input and Output) - 007 Pond <br /> Addendum C -100-year, 24-hour SEDIMOT 11 (Input and Output) - 007 Pond <br /> Addendum D - 10-year, 24-hour SEDIMOT II (Input and Output) - 007 Pond East Ditch <br />