My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1988-04-20_PERMIT FILE - C1981008A
DRMS
>
Day Forward
>
Permit File
>
Coal
>
C1981008
>
1988-04-20_PERMIT FILE - C1981008A
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/5/2021 2:04:43 PM
Creation date
4/19/2012 8:29:38 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981008A
IBM Index Class Name
PERMIT FILE
Doc Date
4/20/1988
Doc Name
Sedimentation Pond 005
Section_Exhibit Name
Tab 13 Attachment E
Media Type
D
Archive
Yes
Tags
DRMS Re-OCR
Description:
Signifies Re-OCR Process Performed
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
98
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
If the water exceeds the effluent limitations requirements of the <br /> NPDES permit, Peabody will retain the water within the permit area <br /> until it meets effluent limitations requirements by one or a <br /> combination of the following techniques: <br /> 1. Pump the water to another sedimentation pond. <br /> 2. Evaporation. <br /> 3. Utilize the water for dust control within the permit <br /> area. <br /> 4. Utilize the water for sprinkler irrigation on the <br /> reclamation areas to increase the soil moisture. <br /> 5. Reduce the discharge rate and/or install dentention <br /> structures such as silt fence or hay bales at the <br /> discharge location. <br /> Whether the pond is bypassed or the water is moved away from the <br /> construction area to other areas of the permit area, Peabody will <br /> minimize erosion and comply with the applicable regulations. <br /> Embankment reconstruction will be conducted in compliance with CMLRD <br /> regulations (see Exhibit 13-15) . The existing embankment will be <br /> cleared of all organic matter prior to the placement of new fill <br /> material . The placing and spreading of fill material will proceed from <br /> the lowest point on the embankment in horizontal layers of such <br /> thickness as to allow for a minimum compaction of 93 percent of the <br /> standard proctor. Fill material will be free of sod, large roots, <br /> vegetation matter, coal or coal processing waste, and frozen material. <br /> Both the upstream and downstream slopes of the embankment will be 3h:ly <br /> or flatter. The completed embankment and surrounding disturbed areas <br /> will be seeded and revegetated to prevent erosion in accordance with <br /> applicable regulations. The 005 East Ditch and West Ditch will be <br /> constructed to divert all runoff from the existing reclaimed area into <br /> Pond No. 005. <br /> 15 <br />
The URL can be used to link to this page
Your browser does not support the video tag.