Laserfiche WebLink
Two different ditch sections are proposed for the diversion ditch based <br /> on the critical slope calculation of the ditch section. One ditch <br /> section will be constructed with riprap and the other section without <br /> riprap, depending on whether the ditch's slope is steeper or flatter <br /> than the critical slope of 1.8 percent. A summary of the ditch design <br /> for the North Ditch is listed below (see Exhibit 13-13). <br /> Ditch Factor North Ditch <br /> Q 3.45 cfs <br /> Z 2: 1 <br /> Shape V-ditch <br /> Alternate A (without riprap) 0.025 <br /> Alternate B (with riprap) 0.040 <br /> d (critical ) 0.71 ft. <br /> S (critical ) 1.5% <br /> V (critical ) 3.39 fps <br /> Based on the above results, the North Ditch of Pond No. 002 will be <br /> constructed with the following minimum dimensions (see Exhibit 13-13) . <br /> Alternate A (without riprap) : <br /> Minimum depth = 2.0 ft. <br /> Side Slope's = 2H:1V <br /> Slope = 0% to 1.5% <br /> Maximum Velocity = 3.39 fps <br /> Q = 3.45 cfs <br /> Manning's N = 0.025 <br /> Shape = V-ditch <br /> Alternate B (with riprap) : <br /> Minimum depth = 2.0 ft. <br /> Side Slopes = 2H:1V <br /> Ditch Slope = 1.3% to 50% <br /> Maximum Velocity = 8.93 fps <br /> Q 3.45 cfs <br /> Manning's N = 0.040 <br /> Shape = V-ditch <br /> 12 <br />