My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1988-04-11_PERMIT FILE - C1981008A (20)
DRMS
>
Day Forward
>
Permit File
>
Coal
>
C1981008
>
1988-04-11_PERMIT FILE - C1981008A (20)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/5/2021 12:04:57 PM
Creation date
4/19/2012 7:58:42 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981008A
IBM Index Class Name
PERMIT FILE
Doc Date
4/11/1988
Doc Name
Facilities
Section_Exhibit Name
Tab 13
Media Type
D
Archive
Yes
Tags
DRMS Re-OCR
Description:
Signifies Re-OCR Process Performed
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
42
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Peabody typically constructs ditches on the inside of roadway cuts for drainage. A <br /> typical V-ditch section would be a minimum of two feet deep with side slopes 2:1 or <br /> flatter. As most road cuts are into resistant bedrock-type material, ditches normally do <br /> not require lining. Culverts will be designed and installed to minimize the runoff volume <br /> conveyed in each ditch. Culverts and ditches will typically be designed using SEDIMOT II <br /> to predict the peak runoff and Manning's equation to determine the peak velocity and flow <br /> depth (see Attachments I and J). <br /> If the ditch is not stable, then Peabody will use a larger ditch section and/or adequately <br /> line the ditch in order to comply with applicable regulations. <br /> Drainage from access roads within the areas disturbed by mining and reclamation activities <br /> (see Exhibits 12-2 and 12-3) will be constructed to meet the requirements of 4.05.2 and <br /> such access roads will at a minimum be constructed and maintained to minimize erosion of <br /> the disturbed area. Erosion control measures to be used singly or in combination include <br /> but are not limited to: <br /> a. Stabilizing all exposed surface areas to promote a reduction in the rate and <br /> volume of runoff; <br /> b. Using straw dikes, riprap, check dams, berms, geotextile materials, mulches, <br /> vegetation sediment filters, contour furrows or other measures that reduce <br /> overland flow velocity, reduce runoff volume, or trap sediment; or <br /> C. Such other measures to minimize erosion resultant siltation and disturbance to <br /> the prevailing hydrological balance. <br /> Surfacing. See Exhibit 13-20 for typical detail. <br /> Culverts. Each access road will be designed, constructed, and maintained to have adequate <br /> drainage using ditches and culverts to safely convey the peak runoff from a 10-year, <br /> 24-hour precipitation event to sediment ponds before being released from the permitted <br /> area (see Exhibit 13-20 for typical details of drainage structures). <br /> Culverts will be installed to avoid plugging or collapse and to avoid erosion at the <br /> inlets and outlets. Riprap will be installed as necessary to reduce the exit velocity. <br /> The minimum width will be the width of the natural downstream channel. The riprap will be <br /> sized in the field by Peabody's project engineer based on the "as-built" slope of the <br /> culvert and final configuration of the exit channel slope area. The sizing shall be based <br /> 13-27 Revised 04/11/88 <br />
The URL can be used to link to this page
Your browser does not support the video tag.