Laserfiche WebLink
April 9, 2012 C- 1981- 025/North Thompson Creek Mine BFB <br />Thompson Creek. Erosion is evident in the area and a small gully has formed on the downslope of the berm <br />(photo 3). Please fix the gully and take appropriate steps to ensure that water will not be diverted toward the <br />creek. <br />ROADS — Rule 4.03 Construction 4.03.1(3)/4.03.2(3) Drainage 4.03.1(4)/4.03.2(4) Surfacing and <br />Maintenance4.03.1(5) and (6)/4.032(5) and (6) Reclamation 4.03.1(7)/4.03.2(7): <br />The main gate was closed but the lock was cut. The access road was in good condition and passable. <br />SIGNS AND MARKERS — Rule 4.02: <br />The main entrance mine identification sign was visible and was updated with the correct information. <br />DOCUMENTS RECEIVED: None <br />ENFORCEMENT ACTIONS /COMPLIANCE <br />No enforcement actions were taken as a result of this inspection. <br />Number of Partial Inspection this Fiscal Year: 0 <br />Number of Complete Inspections this Fiscal Year: 4 <br />Page 3 of 5 <br />Photo 1 — Discharge from Portals #1 and #3 <br />