My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2012-04-16_PERMIT FILE - M2012010
DRMS
>
Day Forward
>
Permit File
>
Minerals
>
M2012010
>
2012-04-16_PERMIT FILE - M2012010
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 4:56:21 PM
Creation date
4/18/2012 4:08:16 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2012010
IBM Index Class Name
PERMIT FILE
Doc Date
4/16/2012
Doc Name
REPSONSE
From
DWR
Email Name
SJR
SJM
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
Page 1 of 1
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
DEPARTMENT OF NATURAL RESOURCES <br />DIVISION OF WATER RESOURCES <br />Reams o_nse to Reclamation Permit Application Consideration <br />John W. Hickenlooper <br />Governor <br />Mike King <br />Executive Director <br />Dick Wolfe, P.E. <br />Director /State Engineer <br />DATE: April 16, 2012 <br />TO: Afephanie J. Reigh, Environmental Protection Specialist 0 <br />CC: Division 2 Office; District 18 Water Commissioner `APR 16 2012 <br />FROM: Caleb Foy, E.I.T. Ce/ _/_ Division of Recio <br />RE: Jolly Pit, File No. M-2012 -010 Mining & Safety ion, <br />Operator: Las Animas County <br />Contact: Phil Dorenkamp, (719) 846 -2931 <br />Sec. 3, Twp. 30S, Rng. 64W, 6`h P.M., Las Animas County <br />CONDITIONS FOR APPROVAL <br />® The proposed operation does not anticipate exposing groundwater. Therefore, exposure of ground <br />water must not occur during or after mining operations. If stormwater is contained on -site, it must <br />infiltrate into the ground or be released to the natural stream system within 72 hours, or all work <br />must cease until a substitute water supply plan, or augmentation plan approved by water court, is <br />obtained. Reclamation plans must ensure water will not be retained onsite for more than 72. hours <br />unless an augmentation plan approved by water court is obtained. <br />COMMENTS: According to the application, the operation does not expect to directly affect surface or <br />ground water systems. <br />le <br />Office of the State Engineer <br />1313 Sherman Street, Suite 818 • Denver, CO 80203 • Phone: 303 - 866 -3581 • Fax: 303 - 866 -3589 <br />www.water.state.co.us <br />
The URL can be used to link to this page
Your browser does not support the video tag.