Laserfiche WebLink
85- 82 River King #6 , Randolph County, Illinois <br /> NOV: 27-1-85 <br /> (1) June 10 , 1985; Illinois Department of Mines and <br /> Minerals; Land Reclamation Division; <br /> (2) Failure to maintain a division structure; <br /> (3) No civil penalty will be assessed; <br /> (4) None to date. Peabody must complete all earth <br /> moving, grading and weir construction in and along <br /> referenced diversion ditch by August 9 , 1985. Seed <br /> bed preparation and seeding of quick growing plant <br /> species mix must be completed by August 31, 1985. <br /> Notice of Violation terminated. <br /> (5) All remedial action completed. <br /> 85- 83 Dugger Mine, Sullivan County, Indiana <br /> NOV: N50610-P-00023 <br /> (1) June 10 , 1985; Indiana Department of Natural <br /> Resources, Division of Reclamation; <br /> (2) Failure to post permit identification signs and <br /> topsoil stockpile markers; No. 2 of 2 - Failure to <br /> remove topsoil in a separate layer from areas to be <br /> disturbed; <br /> (3) New abatement date of August 1, 1985 for violation <br /> 1 of 2. Petition for Administrative Review filed <br /> on July 11, 1985 for Violation No. 2. Petition <br /> withdrawn; New abatement date for Violation 2 of <br /> 2. Step #1 of Violation 2 is November 29 , 1985 and <br /> Step #2 of Violation 2 is November 1, 1985; <br /> Violation 2 of 2 terminated; <br /> (4) Mine entrance signs have been placed where required <br /> with the exception of area of County Road 700 East <br /> South of Pleasantville - Carlisle Road. <br /> (5) On violation 2 of 2, the affected area has been <br /> reclaimed and an alternate material plan was <br /> submitted and approved. <br />