My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1987-11-25_PERMIT FILE - C1981008A
DRMS
>
Day Forward
>
Permit File
>
Coal
>
C1981008
>
1987-11-25_PERMIT FILE - C1981008A
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/3/2021 11:59:14 PM
Creation date
4/18/2012 1:05:43 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981008A
IBM Index Class Name
PERMIT FILE
Doc Date
11/25/1987
Doc Name
List of Violations (Part 2 of 2)
Section_Exhibit Name
Tab 3 Attachment 3-9
Media Type
D
Archive
Yes
Tags
DRMS Re-OCR
Description:
Signifies Re-OCR Process Performed
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
123
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
87-43 Robin Hood Prep. Plant, Boone County, West Virginia <br /> NOV: 0-76-82 (14) <br /> (1) January 15, 1987, WV Department of Energy, Division of <br /> Mines and Minerals; <br /> (2) Failed to properly maintain haulageway and access <br /> roads; <br /> (3) A fine was assessed and paid; <br /> (4) Notice terminated; <br /> (5) Sumps cleaned and haulroad graded. <br /> 87-44 Stickney Prep. Plant, Raleigh County, West Virginia <br /> NOV: 0-48-82 (2) <br /> (1) January 19, 1987, WV Department of Energy, Division of <br /> Mines and Minerals; <br /> (2) Failed to maintain effluent limitations as set forth in <br /> the NPDES program; <br /> (3) Informal assessment conference held on 4/24/87; <br /> assessment was reduced and paid; <br /> (4) Notice terminated; <br /> (5) Pond was chemically treated to attain a clear <br /> discharge. <br /> 87-45 Stickney Prep. Plant, Raleigh County, West Virginia <br /> NOV: 0-48-82 (3) <br /> (1) January 19, 1987; WV Department of Energy, Division of <br /> Mines and Minerals; <br /> (2) Failed to properly maintain approved drainage system; <br /> (3) Assessment was reduced and paid; <br /> (4) Notice terminated; <br /> (5) Sump installed. <br />
The URL can be used to link to this page
Your browser does not support the video tag.