My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1987-11-25_PERMIT FILE - C1981008A (3)
DRMS
>
Day Forward
>
Permit File
>
Coal
>
C1981008
>
1987-11-25_PERMIT FILE - C1981008A (3)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/3/2021 11:39:05 PM
Creation date
4/18/2012 12:45:15 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981008A
IBM Index Class Name
PERMIT FILE
Doc Date
11/25/1987
Doc Name
List of Violations (Part 1 of 2)
Section_Exhibit Name
Tab 3 Attachment 3-9
Media Type
D
Archive
Yes
Tags
DRMS Re-OCR
Description:
Signifies Re-OCR Process Performed
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
100
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
84-83 Latta; Greene County, Indiana <br /> NOV: N40726-S-00018 <br /> (1 ) July 26, 1984; Indiana Department of Natural <br /> Resources, Division of Reclamation; <br /> (2) Failure to conduct blasting operations so the peak <br /> particle velocity does not exceed 1" per second; <br /> failure to conduct blasting operations so that the <br /> air blast is controlled and does not exceed <br /> specified limits; failure to construct siltation <br /> structures prior to disturbance of the undisturbed <br /> areas to be drained; <br /> ( 3) Petitions for administrative review for all <br /> violations filed; petition withdrawn for violation <br /> 3; <br /> (4) Violations 1 and 2 of 3 are vacated; violation 3 <br /> of 3 is terminated; <br /> (5) Permittee had control over structure where <br /> seismograph was located; permittee had control <br /> over structure where seismograph was located; <br /> Csediment and diversion controls constructed. <br /> 84-84 Dugger ; Sullivan County, Indiana <br /> NOV: N40726-S-00017 <br /> (1 ) July 26, 1984; Indiana Department of Natural <br /> Resources, Division of Reclamation; <br /> ( 2) Failure to conduct blasting operations during <br /> times announced in schedule; failure to conduct <br /> blasting operations so air blast is controlled and <br /> does not exceed specified levels; <br /> (3) Motion for summary decision filed and pending for <br /> violation 1 of 2; <br /> (4) Violation l of 2 is vacated and 2 of 2 of is <br /> terminated; <br /> ( 5) Testimonies of blasting crew indicate that time <br /> listed in record was not accurate and that blast <br /> occurred during posted times ; subsequent blasts in <br /> compliance. <br />
The URL can be used to link to this page
Your browser does not support the video tag.