My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1987-11-25_PERMIT FILE - C1981008A (3)
DRMS
>
Day Forward
>
Permit File
>
Coal
>
C1981008
>
1987-11-25_PERMIT FILE - C1981008A (3)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/3/2021 11:39:05 PM
Creation date
4/18/2012 12:45:15 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981008A
IBM Index Class Name
PERMIT FILE
Doc Date
11/25/1987
Doc Name
List of Violations (Part 1 of 2)
Section_Exhibit Name
Tab 3 Attachment 3-9
Media Type
D
Archive
Yes
Tags
DRMS Re-OCR
Description:
Signifies Re-OCR Process Performed
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
100
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
84-52 Power Mine, Henry County, Missouri <br /> NOV: P82-3-3 <br /> (1 ) June 6, 1984; Missouri Department of Natural <br /> Resources, Land Reclamation Commission; <br /> (2) Failure to cover or treat acid and/or toxic <br /> forming materials as identified in the permit and <br /> plan within 30 days; <br /> ( 3) None; <br /> (4) Notice terminated; <br /> ( 5) Submitted items as described in notice; letter <br /> dated 6/5/84. <br /> 84-53 Power Mine, Henry County, Missouri <br /> NOV: P82-3-4 <br /> (1) June 6, 1 984; Missouri Department of Natural <br /> Resources, Land Reclamation Commission; <br /> (2) Failure to redistribute topsoil in a manner that <br /> achieves uniform, stable thickness consistent with <br /> the approved postmining land uses; <br /> ( 3) None; <br /> (4) Notice terminated; <br /> ( 5) Submitted items as described in notice; letter <br /> dated 6/5/84. <br /> 84-54 Dugger Mine, Sullivan County, Indiana <br /> NOV: N40612-5-00017 <br /> (1) June 12, 1 984; Indiana Department of Natural <br /> Resources, Division of Reclamation; <br /> (2) Failure to conduct blasting operations so the peak <br /> particle velocity does not exceed 1 inch per <br /> second and failure to conduct blasting operations <br /> so that the air blast is controlled and does not <br /> exceed specified levels; <br /> ( 3) None; <br /> (4) Notice 1 and 2 of 2 terminated; <br /> ( 5) Blasts after violation were in compliance with <br /> regulations. <br />
The URL can be used to link to this page
Your browser does not support the video tag.