Laserfiche WebLink
PRELIMINARY ADEQUACY REVIEW <br /> NUCLA MINE <br /> PERMIT REVISION NO. 2 <br /> Tab 1 - Executive Summary <br /> Comment: <br /> 1. As this is intended to be an updated document, the information <br /> presented should be as current as possible. Therefore, please <br /> modify the "Facilities" discussion on page 1-2 since the office <br /> building, etc. , were removed well over a year ago prior to mining <br /> in Mine Area 4. <br /> Response: <br /> Tab 1 has been edited to reflect the proper historic and current <br /> situation, and replaces existing Tab 1 in its entirety. <br /> Comment: <br /> 2. We noticed one very minor editorial change needed. On page 1-3, <br /> first paragraph, the reclamation plan is referenced as Tab 13. <br /> With the reformatting, should not this be Tab 22? <br /> Response: <br /> Page 1-3 has been corrected. <br /> Tab 3 - Adjudication File <br /> Comment: <br /> 1. As part of this revision application, Peabody modified the way in <br /> which surface and coal owners are depicted. Existing pages 3-3 to <br /> 3-6 addresses owners regardless of proximity; the revision <br /> application now breaks out ownership based upon whether they are <br /> within or contiguous to the permit areas. The Division believes <br /> the new format is a better way to present the necessary <br /> information; however some editorial corrections are needed to <br /> insure accuracy. <br /> Comment: <br /> A. Page 3-14 introduction specifies "For addresses, see Pages 3-3 <br /> through 3-7." Not all of the listed entities have their addresses <br /> portrayed on the referenced pages. If not on these other pages , <br /> they should be listed below each entity in this section. <br /> Response: <br /> Pages 3-14 through 3-15c have been revised to list addresses for all <br /> entities. <br /> 1 <br />